2014/06/09

2014 June 9 Monday Queens Birthday

2014-06-09

Managed to get a couple days work on the layout despite a bad dose of the Flu and a nose that dripped like a tap.  UGH!!

So track now reaches into Wodonga Platform and I am less than two meters of track to lay to join the first full BG loop up. Unfortunately their are 6 pairs of points in that section and it is taking time to set them all in place.
I wired in the BG track through the Coal Siding and started working back into the siding itself. Their is probably another few days work there after I get trains circulating.
Hopefully  feel better tomorrow and get the Wodonga connection in?
Cheers
Rod