2017/03/19

2017/03/19 Quiet day started a bridge though

2017_03_19 Nearly done on the wiring, however point motors are giving some grief.

Dry fitted the bridge abutments. Now I know how it has to go, should look just right.


Should look ok, as dirt and ballast hide the ply.


The road dips down under the bridge for added clearance. The wing walls are capped but designed to pull back on an angle meaning the bricks are laid up a hill. Not sure if that would happen, concidering bricks are cemented with a wet slurry?

Cheers
Rod