2014/06/15

2014 June 15 She is through Wodonga!!

 2014 June 15 BG connection made, finally.





At 1252 the last spike was placed in the run round road through Wodonga. All droppers are placed ready to connect into the bus :D
Should be a simple job wiring it in, because the point motors, juicers and control switches (points) are built all ready to cut into the facia...



Wooooooeeeeeee!   Long time coming and now its ready tonight, perhaps to run several trains round the very big loop about 94 meters from platform and around both levels and back to the platform

Edit Actually just noticed the through road was connected in as well :)  Seems I was through at least an hour or two earlier ;)

So just need to cut and secure the Platform road. Then solder in 6 more droppers.
Connect 5 juicers and 3 more control switches as well as connect the droppers to the bus.
Guess that's about 4 hours work, at my pace :)

Cheers
Rod