2016_05_10 Spent the day on wiring :) A change!
Had some droppers hanging that needed connecting in. Also found some redundant cables that could be removed. Also as this Railway has 5 Digitrax Command Stations, I altered the outputs to better reflect the power progression around the layout. Found the reason for the loss of power to the branch line, and started setting out the new points in Trentham.
It was rather productive. :)
Al had glued some waste back scene down before he departed Sunday, and it has remained in place without wrinkling up. So it might be a win for us.
Heading for Bendigo tonight, not expected to return home till Saturday. So it will be quiet here for a while. Looking to pick up some SDS Gy's tomorrow at the Hobby Shop
Cheers
Rod