2017_07_17 A little more scenery, a little more on sound installs, and a lot of ruging up inside by the heater.
NBN blues still no internet. Winter starts off with a failed air conditioner (read sole heating) and continues with disconnection of internet communications. What else has it got planned for me?
Scenery
Graeme came over Saturday and we prepared a few areas for scenery. Looking forward to covering the new areas with grass and trees.
Here we started to put the basis of our fascia and filled in the holes in the baseboard, preparing to put Osbourn Street and road in, Then we can add the Shell Fuel depot.
The facia will be glued on to this
Wodonga yard head shunt in place needs track, and cuttings formed both sides of Main.
Preparing cattle run linking stock race to Abattoirs other side of line.
Still touching up our mountain, getting it ready for rock molds which will be next to construct.
Powerline Cars
I think $150 a carriage is a rip-off. Stupid execs at Powerline, delay production of models for 13 years and then slug us another 80 dollars because their dies had deteriorated and were worthless.
Despite the fact that they were rather nice. Despite the fact that the wrong bogies appear to be under the cars. I would have thought First and Economy were SG on Commonwealth bogies, whilst the Scripted First and Second Class were BG SOP on Argentine bogies?
And despite the fact that some cars had interiors back to front.
The new Helix
Good News is that I have been lucky enough to get my new Helix professionally built. Material was delivered to factory today, and if all goes well it will be cut up and temporarily assembled to test it out before delivery within two weeks.
There you go Mr. Al :D its finally happening
Cheers
Rod
2017/07/17
2017/07/02
2017_07_01-02 Coldest night ever! -3.9!
2017_07_02 Early Morning blues!!
Had to get up early to relieve a little pressure old blokes seem to suffer.
Found this
Frost as far as you could see
To the North of West
Looking South of West
Looking West and sun sets over train shed roof. But not at 6.00 am!
Looking North East
Now this picture looks like the sun is rising? Well if it is, we are in deep trouble, because we are looking North WEST near where the sun always sets ??
Here is the picture that connects with the others.. Looking East and sun is up, but hidden by Hills at 6.00 Am.
The runoff from an air conditioner warming the house, is frozen! Nearly put me on my arse, you can just see the skid marks (in the ice stupid :) )
And later I checked the temp which has a sensor out side under the verandah. Min last night at -3.9 C
All explanations gratefully solicited :D
The kids came back from Horse Riding at Chiltern, where it was -7 C this morning
And on the news they said Goulburn got down to -10 C
Its still -2C in the train shed. Guess where I will not be going today :(
Cheers
Rod
Had to get up early to relieve a little pressure old blokes seem to suffer.
Found this
Frost as far as you could see
To the North of West
Looking South of West
Looking West and sun sets over train shed roof. But not at 6.00 am!
Looking North East
Now this picture looks like the sun is rising? Well if it is, we are in deep trouble, because we are looking North WEST near where the sun always sets ??
Here is the picture that connects with the others.. Looking East and sun is up, but hidden by Hills at 6.00 Am.
The runoff from an air conditioner warming the house, is frozen! Nearly put me on my arse, you can just see the skid marks (in the ice stupid :) )
And later I checked the temp which has a sensor out side under the verandah. Min last night at -3.9 C
All explanations gratefully solicited :D
The kids came back from Horse Riding at Chiltern, where it was -7 C this morning
And on the news they said Goulburn got down to -10 C
Its still -2C in the train shed. Guess where I will not be going today :(
Cheers
Rod
2017/07/01
2017_07_01 Scenery and its stilll cold 11C Max
2017_07_01 Graeme came over to change the look of the place a little.
Pictures show the change....
Just measuring up and working out how to support the false fascia
Fixing supports in place
Got an edge that we had to smooth off to the right..
Test fitting fascia with additional supports
and adding to the bottom level as well
We carved away some of the bench work under spirit level to smooth out the false facia.
This will give us the chance to support the foam, and trim up the edges to lay scenery. At the finish we will glue and screw an aluminum true fascia over top to pretty up the effect.
Cheers
Rod
Pictures show the change....
Just measuring up and working out how to support the false fascia
Fixing supports in place
Got an edge that we had to smooth off to the right..
Test fitting fascia with additional supports
and adding to the bottom level as well
We carved away some of the bench work under spirit level to smooth out the false facia.
This will give us the chance to support the foam, and trim up the edges to lay scenery. At the finish we will glue and screw an aluminum true fascia over top to pretty up the effect.
Cheers
Rod
2017/06/23
2017_06_23 Signals?
2017_06_23 Ah forgot the new signal didn't I?
Departure Homes from Honeysuckle to Alansvale (left) or Trentham (right arm)
Amazing detail on Tony's new signal building from base to finnials on top!
illuminated as well!
The Lop bracket received a few months back helps to arrive trains at Honesuckle other sides of points protected by new bracket
Don't remember if I showed this new signal? It departs down trains on the main out of Honeysuckle. It needed to be added to allow access to the Loco turntable.
Glad to see Tony returning to his signal building. However it is hardly a money making venture for him. The new bracket post took more than 12 hours to build (I suspect much more) And who could pay $60 an hour plus parts to build something so beautiful? (Just noticed the disk is hanging off (proceed) . It wont do that when a Tortoise motor is attached to it ;)
Cheers
Rod
Departure Homes from Honeysuckle to Alansvale (left) or Trentham (right arm)
Amazing detail on Tony's new signal building from base to finnials on top!
illuminated as well!
The Lop bracket received a few months back helps to arrive trains at Honesuckle other sides of points protected by new bracket
Don't remember if I showed this new signal? It departs down trains on the main out of Honeysuckle. It needed to be added to allow access to the Loco turntable.
Glad to see Tony returning to his signal building. However it is hardly a money making venture for him. The new bracket post took more than 12 hours to build (I suspect much more) And who could pay $60 an hour plus parts to build something so beautiful? (Just noticed the disk is hanging off (proceed) . It wont do that when a Tortoise motor is attached to it ;)
Cheers
Rod
2017_06_22 trying to get back on track....
2017_06_22 Still cold, but a visit to Bunning's to get some wood and a visit from my signalling contractor is worth a mention?
After not having a heater for over a month after my air conditioner failed during power brown outs last January. Long story but I only switched it on again to heat house up when the cold weather set in, to find it had burned out the compressor. Took a month to convince Insurance Company it was a fused motor and eligible for compensation. So asit warms up from -0.02 C last night to 8.5 C at 11.00 am with aircon set at 20C Economy. I finally feel warm at 17.4 C, after a month of 11.0C days and 8.0 C nights sitting on an electric oil panel heater,
At the same time the shed was 4.0 C just slightly warmer than my fridge which was 2.0 C
Bunnings?
With Graeme's scenery project on the move , we decided to laminate 3mm craft strips along edges to hold foam, plaster scenery in place. Bunnings actually supplied 2400 x 1200 sheets cut down to 200mm widths for me, enabling me to get it home in the wagon, and saving me the trouble of cutting it all up here :D All for $30. A bargain.
12 pieces of 3mm craft wood sheets cut in 200mm strips. These will be used to form edges in particular the curved edges linking Honeysuckle to the trestle bridge and Albury yard to The Murray River bridge and on to the tunnel and around to House Creek on the lower level.
Just adding head shunt towards House Creek, to allow Graeme to add foam
The craft sheets will be laminated to cover edges of layout where foam ends.
The embankments glued in place and now to add foam ground level sheets and cover with towels. This in turn will be covered in the same paper plaster mix used on the other side at Bullarto wheat silos.
Then a combination of static grass weeds trees and other ground cover will finish it off.
Need to make a road. Going to try painting cork black (Graeme said)
And finally the next signal to arrive for Honeysuckle is this one. The bracket post controls movement of up trains from Honeysuckle platform and (left to right) direct route to Alanvale and Bowser Junction mainline access. And the other arm, trains heading to trestle bridge and Trentham
Cheers
Rod
After not having a heater for over a month after my air conditioner failed during power brown outs last January. Long story but I only switched it on again to heat house up when the cold weather set in, to find it had burned out the compressor. Took a month to convince Insurance Company it was a fused motor and eligible for compensation. So asit warms up from -0.02 C last night to 8.5 C at 11.00 am with aircon set at 20C Economy. I finally feel warm at 17.4 C, after a month of 11.0C days and 8.0 C nights sitting on an electric oil panel heater,
At the same time the shed was 4.0 C just slightly warmer than my fridge which was 2.0 C
Bunnings?
With Graeme's scenery project on the move , we decided to laminate 3mm craft strips along edges to hold foam, plaster scenery in place. Bunnings actually supplied 2400 x 1200 sheets cut down to 200mm widths for me, enabling me to get it home in the wagon, and saving me the trouble of cutting it all up here :D All for $30. A bargain.
12 pieces of 3mm craft wood sheets cut in 200mm strips. These will be used to form edges in particular the curved edges linking Honeysuckle to the trestle bridge and Albury yard to The Murray River bridge and on to the tunnel and around to House Creek on the lower level.
Just adding head shunt towards House Creek, to allow Graeme to add foam
The craft sheets will be laminated to cover edges of layout where foam ends.
The embankments glued in place and now to add foam ground level sheets and cover with towels. This in turn will be covered in the same paper plaster mix used on the other side at Bullarto wheat silos.
Then a combination of static grass weeds trees and other ground cover will finish it off.
Need to make a road. Going to try painting cork black (Graeme said)
Cheers
Rod
2017/06/14
2017_06_14 ok so today I ran a few trains.
2017_06_14 The Car Train by Auscision....
https://vimeo.com/221556609 Vimeo Best Quality (Google just hashes it)
Cheers
Rod
2017_06_12 Trying a few hours in shed today..still cold!!
2017_06_12 New Ballast :)
Thanks to Malcolm, I received a few different sizes of Glenrowan Ballast, recently
No wonder this railway is moving along with such friends :)
Ballast grade
Rock culvert etc grade
Dust grade.. yards roads etc.
Cheers
Rod
(ps lost your phone number M)
Thanks to Malcolm, I received a few different sizes of Glenrowan Ballast, recently
No wonder this railway is moving along with such friends :)
Ballast grade
Rock culvert etc grade
Dust grade.. yards roads etc.
Cheers
Rod
(ps lost your phone number M)
2017/06/12
2017_06_11 (continues)
2017_06_11 The pictures are here.
In answer to Tim's email, where he asked if my radii were indeed as broad as I thought 😏 I think I have that covered. I use Fast Tracks specially cut radii tools. They were made for me at 44 inches and 46 inches. On the branch, I try to keep the radius at 36 inches where possible, using the green tool.
And so 44 " and 46" and 48" on the Helix. The 48" was laid using peco parallel track tools fixed to a block of wood, and later adjustable tools bought from Prose's in Turkey.
The "roarer" cars?
pin heights all adjusted (But something is hanging on left. A coupling hose. Must bend it away as it might be fouling coupler? Also right hand car has a coupling bar looking to be fouling??
The shortest radii will be the points and crossovers, all no.6 But seems ok here.
Entering No.6 crossover.
In answer to Tim's email, where he asked if my radii were indeed as broad as I thought 😏 I think I have that covered. I use Fast Tracks specially cut radii tools. They were made for me at 44 inches and 46 inches. On the branch, I try to keep the radius at 36 inches where possible, using the green tool.
And so 44 " and 46" and 48" on the Helix. The 48" was laid using peco parallel track tools fixed to a block of wood, and later adjustable tools bought from Prose's in Turkey.
The "roarer" cars?
pin heights all adjusted (But something is hanging on left. A coupling hose. Must bend it away as it might be fouling coupler? Also right hand car has a coupling bar looking to be fouling??
The shortest radii will be the points and crossovers, all no.6 But seems ok here.
Entering No.6 crossover.
And departing same crossover.
clever design by Auscision and their Chinese engineers, don't you think? Pity our 1/87 scale passengers though!
Cheers
Rod
2017_06_11 Pottering about in snow gear!
2017_06_11 Damn 😬 its cold !!
I had an hour or two in the Train room today and tested the "roarer" cars some more. One of my readers sent me an email with suggestions how I might overcome the derailments.
First
thing I noticed was that all coupling pins were at two different heights,
however none actually hung below rail height. But I did adjust the
lowest ones to match the higher ones.
Alas train still derailed.. Hold
on! The same three vehicles kept derailing the rest were just fine.
Ok
so I ran a mixed train of freight vehicles with RP25/100 and RP25/88
wheels, short 50 footers and long 80 foot flats, some light some heavy.
This train circulated with out problem
I followed it with the "roarer"
cars which derailed at about 15 locations.
So
I started to check the track.
Yes they were derailing at the same
place. Like I said 7 vehicles ok, 3 would derail, but not (all) at the
same place.
Started
adjusting track. Used packers, adjusted curves and in two cases
replaced insulated joiners which were not holding track together
perfectly. The joiners were soft creating out of alignment issues in
height and line. New insulators fixed this problem. Still working on
repairs for other spots.
The track seems to be ok for most vehicles. The Aurora is finding the faults though.
Pictures(to follow as I left camera in shed) will show the radius tools I use as well as the gaps for
diaphragm and buffer plates. They like the 44" and 46" radii but also
navigate the #6 crossovers without derailing. Not a good look but
congratulations Auscision for building cars that close couple and still
navigate through crossovers!!
Cheers
Rod
Subscribe to:
Posts (Atom)

















































