2017/09/16

2017_09_16 Catching up and Sat Workday!

2017_09_16 Lot of work is happening but as for last post, hard to show it in pictures, But lets give it a go :)

Caulfield 2017



Victorian Railways  6 Ton Yard crane re-released by Lyndons trains  www.lyndonstrains.com


Latest version WOW sound for Diesels


Rolling Road test bed.


Nice little buildings for Bullarto.


Mike produced these tidy little electro point modifications. So I bought them from him. Thanks DCC Mike :)


 A lot neater than mine :(


SDS 40 Foot containers. Some (most of) metal plates rattled off in the delivery from China. Simple fix with a little silicon and they are fine now.


Nice stuff coming from this mob :)

And I got a pack of the J, 4 wheel cement hoppers from Austrains which I think I already featured earlier?

So by Saturday after steadily moving around the layout changing out wiring to help with fault finding we get to today with two projects going on.

Graeme came in to add some more cover on his scenery project.

Scenery


Covering up the pink paper towels :) The cutting South of Wodonga.


House Creek.  Lighting changed colours.


Looking further South towards SG Loop (Beyond our mystery tunnel :) )


Need to finish the base of the fascia
.

Home Hill :)
 
 
 Down past the Loco and towards Coal Siding (North)

Wiring up the point motors we installed last week.


Running out of Tortoise Motors, but I found these, purchased a few years back, because they came from an Australian Business. They look great, operate well, and had a price advantage. A huge disadvantage is that they cannot easily be operated manually (like a Tortoise can) They can only move under power. Anyway these are ready to use when we actually run out of the green ones.
 

Whilst looking for more Tortoise machines, I also found these!
They are all provided with a DCC address, and so I will use them in Albury Yard for main line point control.


So when Al arrived, it was time to wire the Trentham points, all 7 of them.


Wiring went quickly, but one point motor failed to work. Replacing it lost us a heap of time. But eventually all 7 points were wired in and working.
The 3 way point needs the frogs to be wired. I have two point motors and three frogs. I don't remember which two get wired together. Will look that up now, and job finished.


Half these wires are obsolete. I removed them, and we were just adjusting some track, and getting to the tidy up stage, when I cut an actuator piano wire with the dremmel to clear couplings. The heat melted the tie bar, and I have to replace it with a brass one. I should have removed power from motor and centered it, because the pressure of the actuator which was red hot as I cut it, melted plastic bar and that was that :(

 

So instead of finishing the job, I had to remove the point and need to replace the bar to work the blades from side to side.

Well that's about it.
Thanks for the company Graeme and Al, we did great work. Cheers
Rod

2017/09/04

2017_09_04 After Caulfield a week of important jobs, that really dont show.

2017_09_04 Scenery, adjusting track and fixing faulty rolling stock by finding out why derailments occur. First look at track, then look at wheels or couplings. Fix the problem!

So that's what Al and I did all day Friday, and we fixed quite a few problems.

Saturday  Graeme spent a day here and we completed  covering the foam with towels ready for top coats.
What will hold this up is fixing the Masonite fascias in place to form the terrain to. Ok need to get them cut at Bunnings, I guess.


Covered and stiffened with fiber towels in white glue (50/50) Brushed on. 


 The Wodonga cutting to House Creek is going to be very nice.


 House Creek up to Kelly Street, and Home Hill.


covering all except the rock molds.

I decided to buy a couple of points from Evan in Indonesia.


I was thinking of using the double track Y point here. The right tracks head up the helix, and the left tracks become the reverse loop. However the left hand side of the Y would have to turn too sharply to the right,to form the loop. So by moving the tracks to the left a little a new double track, right hand junction will fit this place perfectly.


And so Evan will make two more points for me. Here the reverse loop returns to Albury. I can make this junction with Peco Points. However If I move the points to the junction represented by the bit of roadbed sitting on top, and Evan builds me a left hand double track junction, I can save baseboard for Albury, and the point leads straight into the curve. Not a bad investment, as Evan does great work :)

So that brings me to today
Point Motor day at Trentham! 
I was disorganised as ever, but we did get seven Tortoise machines in place, even after breaking two tie bars, removing points and replacing them with brass tie bars.
We got there Al, Thanks mate we did good today :D


We had to pull the trolley out of storage , and laying on my back, I was able to locate the point motors in place and screw them home


Al helped locate the spring wire in the throw bar and held it whilst I made sure the motor was centered.Two screws tighten up and test. The wiring is complete to the points. But the switches are yet to be connected to 12v bus. And as well the live frog is not connected to the Tortoise SPDT switching.. But all is ready to go next time. And finally all those hanging wires can be set in place and be out of sight.
Cheers
Rod




2017/08/24

2017_08_24 Al day All day :)

2017_08_24 Well we are back to normal and our regular workday produced great results today.
First of all, Al completed the track laying at Trentham, and also completed the silo area there as well.

My job was to start mapping out Albury yard, which we will need to work out our approach to the Helix.

Pictures tell the story



So rolling tests were all excellent. Al was pleased with his work, as he should be. First time trains can run on all tracks reliability since we started this project. Thank Goodness ;)


I was supposed to do the wiring and hook up the point motors. Finished up finding some defective track, which took a little time to adjust. Also broke a tie bar trying to attach a motor, and only option was to pull it out and undo some of Al's good work.  It always happens to me, and I am sure it is not that impressive to Al :(  Anyway we both got it all finished and running before 5.00 pm, official end to Alday.



Whilst I was fooling around with wires and point motors, Al completed the second track at the grain silo.


Looking at it, I am going to have to cut a point in this end, as a head shunt. The other end is actually supposed to be a temporary connection, using the head shunt, whilst Honeysuckle was bought on line. If it stays, it will have to be out of service during grain season Ha Ha



So now we have finished track, wired in on the branch line from Bowser all the way to Honeysuckle. However I need tony ,now to come and help me wire that station in place. I think it must be a big job, as he is not enthusiastic about it ;) Which brings me to my job. In this picture you can see I have started to chalk out the south end of Albury yard.


The three way point is through road, runaround road and platform road
The point bottom right is the BG crossing the SG track and it then goes above the three way point to form the two BG roads down past the Station box, and crossing the main lines after the platform, to proceed to Elders and the Flour Mill.
As  you can see I need to work out another way to do it, as its much too tight here.


 A little better?



Sorting out the BG platform roads.


Using SRA diagrams and another designed and drawn by Mick from Murray Railway Modellers, I am attempting to get it all as close as possible.

Micks diagram is at 1 inch to foot, and he had to leave some of it out too. But that drawing represents 63 feet and my shed is just not big enough. The baseboard is not wide enough either.
Lets see what we can do.



Earlier in the day, The Y Class hauled out the first half of the rock train, as the B Class hauls the down morning pass to Honeysuckle



The return pass heads to Wanganella on the up.



A block rock train comes off the branch at Trentham, as the evening pass waits for its turn to proceed up to Honeysuckle. The pilot is shut down for the night. The down goods was cancelled due to track occupation down the track. The rock will pull forward allow the pass to proceed, and then set back in, to stable until track is available for use early in the morning.

Well all I guess we see you at Caulfield?
Heading down to caravan at Kilmore East tonight. Over to see Mum and Dad at Narre Warren, back to Exhibition on Saturday morning. Returning home that night, I guess if things go to plan.
Cheers
Rod Young


2017/08/23

2017_08_22 I found the light at the end of the tunnel.

2017_08_22  Members of Hobson's Bay Model Railway Club have built the final piece of the jigsaw puzzle for Hobson's Bay Northern Division.

Picture Story
At 9.00 this morning Ron and Steve arrived from Kilmore East with the new helix, which was professionally built in Melbourne to our specifications. How about that :)

Al, Graeme, Tony and the boys up here can finally see a layout we can run on, and we all thank you guys for your helix. The last link (of the layout) is finally in place.


After some mean cold, windy rainy weather for the last few weeks, the boys arrived with the helix. It was cold, but the sun was out, not a cloud in the sky.


So with 3 willing helpers, Ron lays out the legs and gets straight into it, with Steve looking on.
 

Al's ready to help as always, but it takes time to get it all set up. Our turn comes soon.


So here we are carrying in the first half.


Hold on lets try this again from this direction.


aha! That worked.  So glad the boys had a site inspection a few weeks  back and were able to sort out the obstacles.

.

ok both parts are in, and now we need to set it together and tie it down.



 Ok everything supported and its steady as a rock. The boys pre-planning worked a treat.


Steve talked me into leaving a gap to better access the showcase. We had the room, so why not?


The first level of track bed is in place, after track is laid out, we can lay the second level, and keep going to the 4th level.


Its locked to wall and floor, and is very steady.


 Hey Rod .......What about some track, before you try to run a train? eh? yeah right!


Showing the framework around the legs.


 Oh boy room underneath for double stacked 50L boxes :)


More frame work.


 Ok the road bed supports are designed to exactly raise the track at 1.5% with a gap of 102 mm which will allow double stacks, if the US prototype boys want to run something on it.



The pegs are glued and tacked to the line, then screwed into place. This stops the screw from twisting the peg.



 Now the road bed is rising, and to save work, the pegs were not sanded to allow for the accent. So track bed is glued and tacked to the top edge, to avoid twisting the bed. The outer peg is about 3mm higher than the inner one, and so that translates into super elevation.


The "roof" is in fact a reversing loop on the branch line, and it houses a terminus station and yard.


Not sure I will fit through the gap, but Al got out after we sealed him in. Guess it will work Ha Ha.


The helix is exactly in line with Albury and the BG on top! Ignore the curved bit laying between the modules. It should face the other way and will be the exit from reversing loop. The helix entry point and the reverse entry is going straight ahead and will enter between the next two uprights to right.


The branch line Terminus Station, up here, will have 34, 36, 38 inch curves and room to place straights where the station points need to go in, for reliability.


I will built a 250mm circular back scene around the hole to stop you seeing the track approaching the station on the reverse loop.


After the lads returned to Kilmore East, Al and I started cleaning up, after Al finished preparing Bullarto for more track.  All ready for track on Albury side, as soon as we work out what space is required for Albury Railway Station buildings..

Till Thursday Cheers
Rod