2013 June 5
Cold!! 4 C to 14C and a South wind off the snowfields it would seem
Not a lot happened. Got to cut out the curves and glue boards together and set up the Curves at the end of the room connecting the coal sidings into the main layout along the long wall. This is a temporary connection to Wanganella, which will eventually be removed when the layout along the west wall of the studio is completed in the future. Next job here will be to set the steady 1% gradient in place then strengthen the curved ply much the same as I did on the 270 deg. Curve between Coal "hole" and Wodonga. Just noticed that separation between the temporary track and the permanent connection into Wodonga (uncle Bens end) may be under 10.5cm the minimum set for double stack (should anybody visit with a set)
The curves are 42'' and look nice!
Cheers
Rod
2013/06/05
2013/06/04
2013 June 4
2013 June 4
Distracted again today :(
Went to Yackandandah Engineering to buy some angle iron, but as usual no one was there to serve me. Ended up going into Wodonga where I got exactly what I wanted, cut to size as well.
Friend Jim offered to bring his welder and fix up the angle bracket supports which I used to stabilise the top level in the middle of room. I have decided I cannot live with the angled supports to these brackets that are in full view. As the whole branch line is well supported by the shelving central posts, these angle brackets only stabilise, and I decided that if I reinforce the top plate with 40 x 40 mm angle iron it will be able to do this without the angle bracket support. Jim came over and took half the brackets home to weld them up for me. When they come back we will install them and then do the other side. Anyway today was otherwise not very productive as was this evening sleeping in front of the tv. :D
Tuesday is often shopping day, so maybe so will tomorrow.
Cheers
Rod
Distracted again today :(
Went to Yackandandah Engineering to buy some angle iron, but as usual no one was there to serve me. Ended up going into Wodonga where I got exactly what I wanted, cut to size as well.
Friend Jim offered to bring his welder and fix up the angle bracket supports which I used to stabilise the top level in the middle of room. I have decided I cannot live with the angled supports to these brackets that are in full view. As the whole branch line is well supported by the shelving central posts, these angle brackets only stabilise, and I decided that if I reinforce the top plate with 40 x 40 mm angle iron it will be able to do this without the angle bracket support. Jim came over and took half the brackets home to weld them up for me. When they come back we will install them and then do the other side. Anyway today was otherwise not very productive as was this evening sleeping in front of the tv. :D
Tuesday is often shopping day, so maybe so will tomorrow.
Cheers
Rod
2013/06/01
2013_June 1
2013_June 1
After 3 days of rain, the ground is soggy, but the studio is always dry and finally warm enough to work in :D
Ok I will mark this as a record of the last few days.
First thing was I got instructions from Mike Walter on how to install the DCC sound chip in my new DRC. I am procrastinating on this, but should finish it soon, as the chip arrived Friday. All I have done thus far is strip out all the electronics and mark the anodes with white paint on all the black wires to help with identification. The chip has been mounted on the roof beside the light board and the speaker has been sealed and glued to the roof over the power bogie. The weight will be discarded..
I started wiring up all the new track (Coal Siding) but discovered I had put the red wire on the wrong rail. To save problems in the future I decided to reverse about 18 connections.
Whilst doing this I was connecting the wires into the DCC bus as I went. Decided to turn the power on and found I had a permanent short. After wasting the best part of a day following all circuits I found that I had installed the live frog points but forgotten to remove the links, and so each point was now a full short.
So I had to pull out every point and remove the links and reinstall. Long tedious job, but fortunately it was easy to put everything back as I found it, and the track has kept its good looking straight tracks etc. Still looks as good as when Graeme left it, which was as I hoped. I also found two points had not had the holes placed to operate the point motor, so it was just as well I could fix that too.
The shorts early on reminded me that I had a new circuit breaker addition to the track sections that needed adding.
So I spent several hours wiring up dual element stop and tail lamps with a solid state circuit breaker, to lower the risk of damaging locomotives or rolling stock accidentally left on a short for a long time.
Talking about tail light or 1156 automotive bulbs
Allan Gartner's Wiring for DCC
Shorts, Power Districts, and the 1156 - Characteristics and Tests
And here is the new modified circuit I am using now
Dick Bronson's DCC Short Circuit Lamps
Now I have sufficient globes wired up ready to mount. Next thing I will need to do is finish off the point motors.
Tony K found that he did not want to use his hex juicers or the single ones he had purchased. So I bought them off him, and will use them to protect the point frogs in the coal siding. It will save me buying the Tan Valley relay units I was going to use.
Continues 2013 June 2 Sunday
Sunday 2013-June 2 Sun was out today, and what a change from the dreary wet weather of the last week.
Here is but a précis of the last 5 days work on the railway :)
Converting DRC to DCC Sound Part 1
I am unhappy about this conversion
However I have come up with the following conclusion.
I could have a DRC built in Korea by Ajin but expect to pay more perhaps? Although the precision Walkers are announced and are priced less than $1100.
after removing 6 tiny screws 2 in middle an another 2 at each end (leaving couplers in place)
2 large screws allow lead weight to come away, and I will discard that, because the speaker will be placed in that space
This image shows the LED's and fibre optic light tubes covered in shrink tube loosely.
This electronic bundle will need to be opened up so that all the black wires can be cut off as long as possible.
Here is the transistor array before cutting away the spaghetti wiring. Only useful for DC Control.
Another view. I am sure some will know what this is all about, I certainly have no idea what this does :)
I used a Jaycar transistor tester to find the anode and painted each one white
I also marked the LED white or red, but unfortunately I decided to remove the fibre optic leads from the light boxes. They are very difficult to return to their places
The light switch is not required so I cut away the wiring.
The twin cables running along the floor also black, are the power leads from the un-powered bogie. Now surely they could have placed a red wire on one side to match the red wire on the power bogie?
Part 2
Ok needed a break from the DRC so went back to work on the layout
This is a Peco Electro Frog (updated version) showing the newly introduced insulated frog.
The improved electro frog has a wire attached to the links of the frog to allow power to be switched to frog to match whichever way the track is set (The frog changes polarity when points are changed. This can be done manually by installing a double pole switch, or using the switching built into most modern switch motors, or automatically using a frog juicer.
This older electrofrog has had both rails cut in order to update the point.
On the underside, I teased out one of the wires and attached a long lead to act as a feed for frog power.
Now I can solder wires to the point blades and link the outer rails on both sides as well as the frog to the juicer, and then feed these to the DCC Bus
Here are the wires hanging underneath ready for connection.
Note also that one point motor is sitting over a 70x19 cross piece. Fortunately the road base was raised and I left the old pieces in place allowing this to be cut away as pictured.
Using a small spade drill to open up a hole under the point throw bar. First I centred the blades and drilled a small hole through the throw bar marking the hole. Then using the hole as a marker, I drilled out a small hole and then fitted the point back on top.
Part 3
Well after soldering on another 35 pairs of droppers, I was getting bored, and anyway I was doing a lousy job. I just could not get the temp right and was melting sleepers when I tried to fix the dropper. So I moved on ;)
This picture shows me tearing out the old temporary store roads on the bottom level, and preparing to set up the track bed for the connection between Wanganella and Coal siding (This is a temporary connection which will allow trains to circulate until I finally get the section on the other side under way. This way I can do some scenery and finish off the layout as set up now, before expanding into the Grafton area.
I saved all the old wood and screws ;) As the timber was sitting on top, it was 38 mm too long to allow me to sit it in between the side rails. So I cut up all the pieces and put them back this way. This effectively lowers the baseboard 70mm and now I can climb the new trackbed out of Coal siding and up a 1% grade to the modified deck. From there it needs to climb another 40 mm to meet up with the main line out of Wanganella on the hill. Slightly more than 1.5%.
And that's about as far as I got today. Lots of progress even if I had to redesign 20 feet of baseboard. Even so I am pleased as it was real progress over three days
Cheers
Rod
After 3 days of rain, the ground is soggy, but the studio is always dry and finally warm enough to work in :D
Ok I will mark this as a record of the last few days.
First thing was I got instructions from Mike Walter on how to install the DCC sound chip in my new DRC. I am procrastinating on this, but should finish it soon, as the chip arrived Friday. All I have done thus far is strip out all the electronics and mark the anodes with white paint on all the black wires to help with identification. The chip has been mounted on the roof beside the light board and the speaker has been sealed and glued to the roof over the power bogie. The weight will be discarded..
I started wiring up all the new track (Coal Siding) but discovered I had put the red wire on the wrong rail. To save problems in the future I decided to reverse about 18 connections.
Whilst doing this I was connecting the wires into the DCC bus as I went. Decided to turn the power on and found I had a permanent short. After wasting the best part of a day following all circuits I found that I had installed the live frog points but forgotten to remove the links, and so each point was now a full short.
So I had to pull out every point and remove the links and reinstall. Long tedious job, but fortunately it was easy to put everything back as I found it, and the track has kept its good looking straight tracks etc. Still looks as good as when Graeme left it, which was as I hoped. I also found two points had not had the holes placed to operate the point motor, so it was just as well I could fix that too.
The shorts early on reminded me that I had a new circuit breaker addition to the track sections that needed adding.
So I spent several hours wiring up dual element stop and tail lamps with a solid state circuit breaker, to lower the risk of damaging locomotives or rolling stock accidentally left on a short for a long time.
Talking about tail light or 1156 automotive bulbs
Allan Gartner's Wiring for DCC
Shorts, Power Districts, and the 1156 - Characteristics and Tests
And here is the new modified circuit I am using now
Dick Bronson's DCC Short Circuit Lamps
Now I have sufficient globes wired up ready to mount. Next thing I will need to do is finish off the point motors.
Tony K found that he did not want to use his hex juicers or the single ones he had purchased. So I bought them off him, and will use them to protect the point frogs in the coal siding. It will save me buying the Tan Valley relay units I was going to use.
Continues 2013 June 2 Sunday
Sunday 2013-June 2 Sun was out today, and what a change from the dreary wet weather of the last week.
Here is but a précis of the last 5 days work on the railway :)
Converting DRC to DCC Sound Part 1
I am unhappy about this conversion
However I have come up with the following conclusion.
I could have a DRC built in Korea by Ajin but expect to pay more perhaps? Although the precision Walkers are announced and are priced less than $1100.
after removing 6 tiny screws 2 in middle an another 2 at each end (leaving couplers in place)
2 large screws allow lead weight to come away, and I will discard that, because the speaker will be placed in that space
This image shows the LED's and fibre optic light tubes covered in shrink tube loosely.
This electronic bundle will need to be opened up so that all the black wires can be cut off as long as possible.
Here is the transistor array before cutting away the spaghetti wiring. Only useful for DC Control.
Another view. I am sure some will know what this is all about, I certainly have no idea what this does :)
I used a Jaycar transistor tester to find the anode and painted each one white
I also marked the LED white or red, but unfortunately I decided to remove the fibre optic leads from the light boxes. They are very difficult to return to their places
The light switch is not required so I cut away the wiring.
The twin cables running along the floor also black, are the power leads from the un-powered bogie. Now surely they could have placed a red wire on one side to match the red wire on the power bogie?
Part 2
Ok needed a break from the DRC so went back to work on the layout
This is a Peco Electro Frog (updated version) showing the newly introduced insulated frog.
The improved electro frog has a wire attached to the links of the frog to allow power to be switched to frog to match whichever way the track is set (The frog changes polarity when points are changed. This can be done manually by installing a double pole switch, or using the switching built into most modern switch motors, or automatically using a frog juicer.
This older electrofrog has had both rails cut in order to update the point.
On the underside, I teased out one of the wires and attached a long lead to act as a feed for frog power.
Now I can solder wires to the point blades and link the outer rails on both sides as well as the frog to the juicer, and then feed these to the DCC Bus
Here are the wires hanging underneath ready for connection.
Note also that one point motor is sitting over a 70x19 cross piece. Fortunately the road base was raised and I left the old pieces in place allowing this to be cut away as pictured.
Using a small spade drill to open up a hole under the point throw bar. First I centred the blades and drilled a small hole through the throw bar marking the hole. Then using the hole as a marker, I drilled out a small hole and then fitted the point back on top.
Part 3
Well after soldering on another 35 pairs of droppers, I was getting bored, and anyway I was doing a lousy job. I just could not get the temp right and was melting sleepers when I tried to fix the dropper. So I moved on ;)
This picture shows me tearing out the old temporary store roads on the bottom level, and preparing to set up the track bed for the connection between Wanganella and Coal siding (This is a temporary connection which will allow trains to circulate until I finally get the section on the other side under way. This way I can do some scenery and finish off the layout as set up now, before expanding into the Grafton area.
I saved all the old wood and screws ;) As the timber was sitting on top, it was 38 mm too long to allow me to sit it in between the side rails. So I cut up all the pieces and put them back this way. This effectively lowers the baseboard 70mm and now I can climb the new trackbed out of Coal siding and up a 1% grade to the modified deck. From there it needs to climb another 40 mm to meet up with the main line out of Wanganella on the hill. Slightly more than 1.5%.
And that's about as far as I got today. Lots of progress even if I had to redesign 20 feet of baseboard. Even so I am pleased as it was real progress over three days
Cheers
Rod
2013/05/23
2013 May 23
2013 May 23 Thursday The Posty just arrived :)
Got my first look at these new OzRail L wagons today. My first impressions were favourable. Have a look at these pictures.
My L vans came in packaging from our newest Chinese Importer, much like any other, as we would expect
Individually wrapped in plastic and sitting closely in a moulded package. All arrived intact in great condition. The top and bottom mouldings were sticky taped on all 4 sides and needed separating with a knife.
On the left a SEM kit completed and painted in the more modern red. The OzRail model is in the early brown livery, which I feel detracts a little from them particularly those that model the end of the 4 wheel era.
The larger diameter wheels lift the floor slightly. I am sure David and Chris have their reasons for the differences.
The roof heigh almost the same?
Ends Sem on left
Two roof styles of OZRail models with SEM in middle.
Axle box and springs and those large diameter wheels :)
Top View
Underneath SEM on left
Those who model true BG will like the extra room allowing opening up the gauge ;)
Happy to see the wheels looked better than the samples we saw a year or so ago.
the bars look ok to me
Yeah I'm satisfied with my purchase.
Than You Chris :D
Bugger! it blurred but I am not going back to set it up again :(
I think most will be happy but still interested to see what our members think
Cheers
Rod Young
Got my first look at these new OzRail L wagons today. My first impressions were favourable. Have a look at these pictures.
My L vans came in packaging from our newest Chinese Importer, much like any other, as we would expect
Individually wrapped in plastic and sitting closely in a moulded package. All arrived intact in great condition. The top and bottom mouldings were sticky taped on all 4 sides and needed separating with a knife.
On the left a SEM kit completed and painted in the more modern red. The OzRail model is in the early brown livery, which I feel detracts a little from them particularly those that model the end of the 4 wheel era.
The larger diameter wheels lift the floor slightly. I am sure David and Chris have their reasons for the differences.
The roof heigh almost the same?
Ends Sem on left
Two roof styles of OZRail models with SEM in middle.
Axle box and springs and those large diameter wheels :)
Top View
Underneath SEM on left
Those who model true BG will like the extra room allowing opening up the gauge ;)
Happy to see the wheels looked better than the samples we saw a year or so ago.
the bars look ok to me
Yeah I'm satisfied with my purchase.
Than You Chris :D
Bugger! it blurred but I am not going back to set it up again :(
I think most will be happy but still interested to see what our members think
Cheers
Rod Young
2013/05/19
2013 May 19
2013 May 19 Sun is appearing for a hour or so, clouds again and sun back for a short time Still bloody cold :(
I talked Graeme and Norma into staying another day :D
So after a quick trip to Albury to get rid of a hire car, at 1130 we again turned our minds towards the Coal Siding.
Here I am with my mouth shut, is that a smile Graeme? Already a couple hours into construction and the SG loop and yard is almost completed.
I was asked recently if I felt like I was leaning on my friends too much?
Nah!! certainly not :( Who ever would think that?
One of those defining moments? Something like boring a tunnel from both ends and meeting in the middle?
The new track arrives at the Albury end and line up perfectly on the points, and it would seem the abbreviated yard is going to fit ok.
Graeme checks out the Wodonga end. In this shot you can see we discovered when looking at the pictures from yesterday that we had forgotten to install the SG entrance points towards the yard. Job now done and the loop is very much mostly built and looking great.
I guess Graeme has headed off for another holiday and will be at Corowa tonight... hmm that's not far is it? Maybe I could get him beck for...... No better not! Not sure how Norma would take that :D
Cheers
Rod Young
All pictures are reduced in size. Double click any picture to see it full size :)
I talked Graeme and Norma into staying another day :D
So after a quick trip to Albury to get rid of a hire car, at 1130 we again turned our minds towards the Coal Siding.
Here I am with my mouth shut, is that a smile Graeme? Already a couple hours into construction and the SG loop and yard is almost completed.
I was asked recently if I felt like I was leaning on my friends too much?
Nah!! certainly not :( Who ever would think that?
One of those defining moments? Something like boring a tunnel from both ends and meeting in the middle?
The new track arrives at the Albury end and line up perfectly on the points, and it would seem the abbreviated yard is going to fit ok.
Graeme checks out the Wodonga end. In this shot you can see we discovered when looking at the pictures from yesterday that we had forgotten to install the SG entrance points towards the yard. Job now done and the loop is very much mostly built and looking great.
I guess Graeme has headed off for another holiday and will be at Corowa tonight... hmm that's not far is it? Maybe I could get him beck for...... No better not! Not sure how Norma would take that :D
Cheers
Rod Young
All pictures are reduced in size. Double click any picture to see it full size :)
2013 May 18
Yesterday may mate Graeme and his wife Norma came for a visit and it was great catching up. Graeme kept pushing me to do some layout work, and finally I understood he was serious. Fortunately with a short delay in setting up, we were able to spend a couple of productive days setting out and installing the most difficult part of the Coal sidings. It was pretty cold but busy hands kept us warm.
After a few hours work here is a picture of of Graeme about to damage his head under the top deck. Fortunately the blood did not flow
Here is the Wodonga end points The BG enters coal siding by crossing over the SG
On the backdrop Graeme is finishing off the BP siding, Can you see it is protected by catch points both ends
Hey Graeme :) smile! I better introduce you to the Blog. I have known you for 41 years and you built me parts of at least five layouts and I am very pleased to see you here this weekend.
Thank you again.(and again and again ;) )
Its late Its cold (8.3 C in studio with no heating). Finishing up and ready to go into town for a meal. So what did I do,apart from taking the pictures? Well I could say I entertained Graeme with colourful conversation whilst he slaved away laying out the route. But I tried to keep all the soldering and modifications one step ahead so that Graeme did not have to hang around and wait .. Ha Ha!! productivity whilst it is available Ha Ha!
Using a NMRA track gauge to see improvement in flangeway after adding .010 x .060 Evergreen strip styrene to the inside of guard rail on all Universal points that I recovered from my original 1985 layout at Greensborough. I believe that the material added forces the RP25 type wheels away from the (plastic) nose of the frog. It does not fully convert them to NMRA standard, but it does help to save the nose from being worn away. And I found that it makes the Universal points more reliable.
Time to go shopping :) More later
To be continued :)
Cheers
Rod
2013/05/16
2013 May 16
2013 May 16 A very wet and cold Thursday
Sorry people nothing to report here, as I have not even been in the Studio since the last post :(
I have car troubles, again It seems that the bad fuel I got a year ago, most probably has reeked more damage on my Landy. The Injectors and almost certainly the Injector Pump have been damaged and are leaking enough to be dangerous. The Landrover Discovery is now sitting at Blacklocks waiting repairs.
The good news is that Insurance will probably cover it, and if they dont the bad news is that a proper fix that can give me confidence to tow my van far and wide will cost over $7000 and possibly more.
Anyone with a common rail diesel engine should know that bad fuel will destroy your fuel pumps, your injectors and Injector pump. It does not matter if you own a Nissan, Toyota, Mitsubishi or a Mercedes or any other Common Rail, You are going to be slugged $1000 for a pump $2000 for a high pressure injector pump and up to $1000 for each injector! Mine has 6 of those. Its a days labour and possibly up to 12 hours if the mechanic is not good at his job, and when undoing the timing belts you would be mad not to replace them too, another $700.
Where did I get bad fuel? It really does not matter The operator may not be responsible for what his staff does. So another friend say he only uses Coles or Safeway outlets because he felt that rogue managers might have trouble operating in places like this. If the pump is clean, not diesel greasy and the smell is not what you expect, then you are not going to continue your fill up there!
Fortunately it would seem that Allianze accept that rogue fuel operators are out of the Insured owners control and usually agree to reimburse them, which is quite a relief. I got to hope and pray it happens.
Otherwise I got this cheap hardly used shed full of stuff to sell :(
Rod
Sorry people nothing to report here, as I have not even been in the Studio since the last post :(
I have car troubles, again It seems that the bad fuel I got a year ago, most probably has reeked more damage on my Landy. The Injectors and almost certainly the Injector Pump have been damaged and are leaking enough to be dangerous. The Landrover Discovery is now sitting at Blacklocks waiting repairs.
The good news is that Insurance will probably cover it, and if they dont the bad news is that a proper fix that can give me confidence to tow my van far and wide will cost over $7000 and possibly more.
Anyone with a common rail diesel engine should know that bad fuel will destroy your fuel pumps, your injectors and Injector pump. It does not matter if you own a Nissan, Toyota, Mitsubishi or a Mercedes or any other Common Rail, You are going to be slugged $1000 for a pump $2000 for a high pressure injector pump and up to $1000 for each injector! Mine has 6 of those. Its a days labour and possibly up to 12 hours if the mechanic is not good at his job, and when undoing the timing belts you would be mad not to replace them too, another $700.
Where did I get bad fuel? It really does not matter The operator may not be responsible for what his staff does. So another friend say he only uses Coles or Safeway outlets because he felt that rogue managers might have trouble operating in places like this. If the pump is clean, not diesel greasy and the smell is not what you expect, then you are not going to continue your fill up there!
Fortunately it would seem that Allianze accept that rogue fuel operators are out of the Insured owners control and usually agree to reimburse them, which is quite a relief. I got to hope and pray it happens.
Otherwise I got this cheap hardly used shed full of stuff to sell :(
Rod
2013/05/09
2013 May 9
2013 May 9 A quiet day spent mostly baby sitting (sorry "Big Girl" sitting says my 4 year old grand daughter :D )
Sorry about lousy picture :) But the content looks ok to me ;)
Sorry about lousy picture :) But the content looks ok to me ;)
Well I found out today what Austrains planned to release at
Hobsons Bay. Imagine that over the past 4 Exhibitions every product
planned to release at Collingwood was late! The first time I product is
sitting and waiting to go... Hobsons Bay goes arse up.
The news is not good over there either
Marching
orders are we are to be out January 1 2014 from our leased rooms at
West Melbourne. We can probably hang out for a while if we do it right,
because the other tenants BHP have told
VicTracks to go root themselves They have another 4 years on their
lease, I heard.
Subscribe to:
Posts (Atom)