2019/05/13

2019_05_13 Playing around with my RUB set plus new Loco!

2019_05_13   Lighting it up...

S313 comes around behind Wodonga with the Daylight behind.






Almost all circuits are completed and test ok around Wodonga station.
All I need now is the point motor switches to be connected. Ha Ha  Promises of things to come.. eh?
Cheers
Rod
EDIT


Another project Trainbuilder W Class. But I am having trouble getting the top off to install a sound decoder. More to come?  Now Bruce tells me to detach the handrails, and being careful not to scratch, lift body off. Damn thing is not moving.  Maybe I am being too careful? We will see.
Rod


2019/05/05

2019_05_04 second coat!

2019_05_04 Another coat!  
Yeah looks ok, I think.




















Second coat. Not an artisan painter, but it will do :D

Now back to rewiring the helix. I can see a weeks work here alone
Cheers
Rod

2019/05/04

2019_05_04 Paint it black..

2019_05_04  So today we painted it black.


Here is the first coat.  Ever tried to buy interior black paint?  asked Graeme :D





















Put a second coat on later in afternoon, will finish painting when I take clamps off tomorrow.
We both like the look.
Cheers
Rod

2019/05/03

2019_05_03 Continued update

2019_05_03  Postie here.....

Quick trip from China arrived same day as a slow trip from Melbourne.

Decided to try out 5000K white Led strips 120 to meter led's. Got a bulk buy for under $100
Then ordered Aluminum holders with diffusers 40 m for  $152.
Disappointed that joining pieces shown in add were not included.







Now just need to figure out how to join them..  Its never easy, is it?
and from an Aussie address, but delivered from China,







Lets us see how long this takes to get installed Ha Ha

Cheers
Rod

2019_05_03 Mass Assembly he he!!

2019_05_03  After about 3 years we fitted some point motors :D

Just hope it doesn't take another three years to install the Tam Valley Octopus switches :(


Al came over and brought the rain with him. Don't think I ever remember it raining this hard for so long.
Al is soldering on red and black wire leads and tinning the lug to take the frog wires hanging under the layout


 I bought some Tam Valley assembled servo point motors a few years back on a Friday 13th day 20 % off sale. Now its time to power up the frogs and complete the circuits in Wodonga yard using the built in micro switches,  provided.  Here I am testing the servo (test box that centers servo) and straightening the wire throw. Always flat, where are the spare AA batteries?


Hard at work, no time for chatter.  I left out the pictures of me laying on the trolley under layout doing the job, I hate most... soldering the frog wire to the switch...  upside down!.  I then lined up the point with Al checking the throw from above.
We found two points above a brace and were unable to put motors underneath. I will have to get creative and mount them in a building on top, I guess.
In all we took most of the day to install 10 motors, got another 6 ready to install, but time ran out.

As well I connected all wiring underneath to the relevant bus line.
Damn good day. Thanks Al for your company and assistance.
We finished off the day with a train running the branch back to the helix. About 6 scale miles.Cheers
Rod
ps the air conditioner had us sweating in an hour, and we turned it off. How about that?
Given it was raining, and not so cold, it will be interesting to see how it works when its really cold, outside.
RY

2019/05/01

2019_05_01 MAY I show you my light?

2019_05_01  Playing with the lights.. pictorial



Deliberately taken on a dull rainy day, without flash, but should have used macro. This is with LED strip lights above. I had bought sunny white lights about 5 years ago. 300 LED's per 5m. So I used two strips to match newer 600 Led strips. I mounted two strips of LED strip onto a plastic angle attaching it so that LED's faced left and right at 45 degree angle. I think it works  :D

Here follows the testing.




 Room LED lights only!


 Room lighting plus two rows of strip LED's. Shadow caused by LED tubes on roof (room lighting)
This will not be a problem when plastic reflector goes on top of frame.


By the way train was driven here from top of old helix. Track working fine and all sections wired correctly allowing trains to proceed into Honeysuckle... YEIIII!!!!



 Room lighting on, rear strip LEDs only



Room lighting on, rear strip LED's only


 Room lights on, and one strip LED's on (Front)



Room lights on, and one strip LED's on (Front)


 Room lights off, and one strip LED's on (Front)




 Room lighting off, one rear strip on.(rear) Note shadow from roof LED's gone as well.


Room lighting turned off. Both LED strips on.

Edit I used plastic angle to mount LED's Had it on hand, thanks to Graeme S.





The air conditioner lifted temp from 11C to 21C in 15 minutes (at the back of room 15 m away) Much better than before the roof was repaired.
Cheers
Rod Young

2019/04/28

2019_04_28 Tradesman bitch!! and more wiring

2019_04_28   So what does a tradesman make an hour and what do you get?



About a year ago, I invited this guy to install my $2000 (huge) Panasonic Air Conditioner (Thanks Good Guys for a "Friday" discount,on top of an already great price which was hundreds under Harvey "GST" Norman.


When its on the drain drips over the doorway, straight down the back of your neck. The fix was to wrap it with insulating tape which fell off two days later. I thought that was what blue glue was for?



I was quoted $850 install, because a gap had to be cut into roof above air conditioner to allow air to enter at top. I cut hole and they used it to install the unit over door.  When I asked them to box it in, they went away for more materials.  Never saw them back again, however the bill arrived and was upped to $1580 for the extra work involved. They never came back. I paid them cash for job (Yes big mistake) I hope they paid GST because I asked the taxman to check if they did. They worked 3 hours. Well one guy did. The electrician was there for only an hour. So 4 hours into $1600 is about $400 an hour and I had to get another Tradesman (actually a real tradesman ) to finish the job.







Cutting the hole out properly (I am not a tradesman :blush: ) After removing the roof iron and insulation.



Build a box and seal it into the ceiling. Paint and voila!


Now the ceiling cavity can get hot or cold, and the airconditioner can circulate the warmed / cooled air and operate more economically. Thanks to my son Dale Young... A real tradesman.
Now as long as the door is not opened or closed as the large door flap drops down when AC turned on and off. The rest of the time it sits neatly out of the way.

Back to the Model Railway  :D




More wiring, and yesterday and today, I have continued on with the project to get this job finished and trains running again. Al and I started this on Thursday, last. the wiring is slowly progressing, and of course it is even slower as a one man operation. 

The big news is that I how have all six districts connected into the system, and the short circuit appears to be fixed.  No breaker alarms at all for a week Ha Ha.

Have a sound  loco advancing down the SG track as each dropper is connected. Out of shot a GM does same thing on the BG...    This is exciting!!

Cheers
Rod Young

2019/04/26

2019_04_26 Please Help!

2019_04_26   Missing Tool (Thief?) Gremlin noticed to be in or about Yackandandah!



Note!!  This is not one of the two missing packets....  This one was pictured after a 40 km round trip to replace the missing items. Could everybody take a look outside and see if either the theft gremlin or the stolen items are close by?

They were last seen in a flimsy plastic bag after emptying all other items. When I went to put them away they had vanished from the face of this known universe.

Was it my imagination or not? Are they under the seat of the car?  Did I indeed buy them?  Perhaps the receipt was wrong and I never bought them at all?    Or that rascally gremlin indeed paid me a visit on Thursday? Maybe I am the victim of a eh?...  stick up?

Meantime as I was still rewiring the helix, visiting Tony McK. helped out by repairing several faulty points and adjusting point motors on the branch, and now trains can safely operate to the trestle bridge near Honeysuckle.

Thursday was AL-Day!!  Al's back after over 9 months of recuperation, and we eased into rewiring Wodonga yard. Very successful day and we found the cross feed that indeed caused my major short circuit. I was able to successfully connect up every territory  without hearing the circuit breaker trip every few seconds. Yeiii!!!!  for the first time in a long time, trains are running again.

So Al and I worked from High Street Wodonga  towards Uncle Bens, and fitted several points as we went. Removed all temporary wiring and installed permanent links. Half the job got finished, only interrupted by a section of track that was sitting high  above the sleepers and looking really bad. So we replaced that and moved on.

Had a great day and Al supplied the sausage rolls!!  Love those sausage rolls!!

Here is the obligatory picture trail for today.






Rewiring and testing started beyond drill and ended about...





 ...where the soldering iron sits. Point motors used were Tam Valley assembled servo type with a two way frog switch fitted.


 Bit of track right of pliers was lifted and replaced.


New wires hanging down and old wires being snipped off as we go. Gee its going to be nice to see that looking tidy after all this time.




About to finish up after Al left and noticed that the joiner had come away up here. Loaded it with liquid nails and try again :D

Cheers
Rod