2016/04/14

2016_04_14 Benchwork starts!

2016_04_14  Al and I started the new benches.

We had a couple of L girders from elsewhere, and built these up into a solid bench. Cut out three more benches and assembled one of them. Not a bad days work :)


When we finish the wall, on Saturday, I will remove the legs against the wall and fix the L Girder to the noggins behind the plaster.
The out rigger supports will be cut shorter after the top level roadbed is fixed. This will not happen till the 5 ply tops are fixed on the bottom, and the track is installed, wired in and sceniced.

Cheers
Rod