2016/10/06

2016_10_06 Continues

2016_10_06  Still trying to get the silo area looking right

Decided to install a platform, which needed more track rearrangement. I bought the station on E Bay a few years ago. Maybe someone will recognise it  :)



 Already I find the requirements needed to keep curves on the SG about 44" or above are going to force me to remove all the points and move them away from the BG points temporarily located (on top) near the platform.. The slip is roughed in, and this is not going to work.


The SG sneaks in behind, just as on the North East Line and the 80 footers are looking ok.

The station is fully detailed and has a goods shed on main platform. Not prototypical, I guess, but a nice little scene, none the less.







Cheers
Rod

2 comments:

  1. Hello Rod
    A nice little station and goods shed. I also like a comment on the nice blue SOP carrages. yours sincerly Malcolm Aldridge

    ReplyDelete
  2. Thanks Malcolm. I should be out there fixing the track :( However Bathurst got in the way, didn't it ;)

    The SOP cars are fresh out of the box, and another project waiting for work to be done. I have had them for 20 years, so no hurry, I guess.
    Cheers
    Rod

    ReplyDelete

All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D