I don't have much luck with air conditioners, do I?
Average temp is 38C and unless I get in before 8.00am the shed is out of bounds.
Two local Air-Con repairers are just not coming out to repair it after 4 weeks waiting.
I picked up some very nice WAGR open wagons from SDS as well ordered a Class 30T from Austrains for Albury.
As well a DRC I ordered was ready to pick up.
Because I am not getting things done outside, I decided to move my tools and DCC test gear into my office, and so I at least can get things done inside where the aircon does now work.
SDS built WAGR open wagons for SG freight variety.
Now at Tess Springs the new DRC and a trailer I already had. (OK Steve I found the fault, or at least the camera, did :) Its cool.)
And so I moved it in, but now I have to clear the shelves to put this stuff in place and clear the small desk place to have any chance to do some meaningful work in here :D
Cheers
Rod
No comments:
Post a Comment
All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D