2018/03/16

2018_03_16 Playing with the B.E.

2018_03_16  laying asphalt :)

I got some thin foam from Office Works, and more from a dollar store at Birralea.
Added it on top to see if it looked like bitumen.


So this is what we started with. The white foam is about 2 mm thick and came in 5 sheets, all white.


The black sheet came in a pack of 5 different colours. Only one black sheet :(


 It nearly comes up to rail height. So a track cleaner gently rubbed should clean the head of the rail.


Started to chalk and rub with a cloth after white glue set. I will finish this off tomorrow. I am happy it will work. Also finish off covering the white with black.


Got a parcel from States. I just cannot find things like pallets, workshop machinery skips etc here, got them all in one box. A bit pricy though.

The Parcel?





 Fork lifts, Elevators Workshop machinery such as drill press and lathes Welders etc.


Skips and pallets and hand held pallet lifts. and milk churns for Depot as well as bicycles and stuff such as that.

Cheers
Rod

2 comments:

  1. Hmmm we should have weathered the rails

    ReplyDelete
  2. Ah we still can, but no body will notice, maybe?
    Cheers
    Rod

    ReplyDelete

All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D