2018/12/03

2018_12_05 Roger visit this weekend Installing Wodonga

2018_12_03  As normal another installation requires a tear down first!

 also I forgot the camera and missed pictures of the removal of existing deck.


Notice the out riggers were extended so wider ply could be applied to top.





 Simple blend in to edge of layout. Similar will be applied to Melbourne end, past stock race.




 We lifted station above base board height first by gluing 3mm MDF (not best but was on hand)



 Roger checking to see where installation fits...


 Location and positioning to track, typically Roger sorts out the problems.


Fits like a glove!
 



Mounting Wodonga in place. Blocks locate it but allow lifting building from layout.




ok  as you can see, the awning was close, however all fixed now!


 lights applied to most rooms, and they are switchable via sic micro switches.



We were so pleased with this A hell of a lot of work and all because of such a great friend. Thank you again ,mate.




Just enough room for a car to pass the building towards the signal box.






Waiting room and Drivers room, lights on.


Brighter shot




All stuff packed away, but an AN 700 and these cars fit like a glove Ha Ha. Platform holds 8 S Cars and a Locomotive.
Massive improvement creating all the space in front of station!






 Roger kicked Holly out, when she looked like jumping onto Wodonga. Well I think an ambush is being set up ?? Ha Ha.


Addendum
increased stock yard real estate as well



 Bit of room for larger yards and road vehicles, and can add walking trail to Abattoirs.




 Got to sort out what goes where, but hope to combine a Walthers stock race with three of Southerns cattle (and sheep) ramps

Cheers
Rod















No comments:

Post a Comment

All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D