2020_09_01 (continues) with exciting electrical wins.
Pretty happy with the wiring effort over last couple days.
Managed to sort out some problems with the connection between Wodonga Coal Siding and Albury, still not working, but promising. And anyway I have the new BXPA1 to try if this does not work out.
I also removed the UR92 Duplex radio receiver and placed it closer to the Command Station. It set up really easily, and the new throttle DT602D connected to it without doing anything, apart from fitting 3 AA batteries.
Talking about the throttle, I fiddled with it for most of the afternoon, and I can say it is a real improvement, however it will be quite a learning curve, even though it does duplicate most of the actions of the DT400 type throttles, it does it in a different way. Wont take long to sort it all out :)
So with the link to Albury not yet working, back to the wiring Ha Ha
Cheers
Rod
No comments:
Post a Comment
All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D