2013/11/15

2013 November 15 (Continues)


2013 November 15 (Continues)

Ok So these are the rest of the pictures Enjoy ;)

 Goodness!!  Instructions...


16 pages of them and this is going to take some time, and it did too ;)




So next thing to do is get it out of the plastic. Time to head for the Train Room.......

Several hours later, here are the pictures and a video too if I can load it...


























Two things to watch out for. The footplate linking loco and tender snapped when I lifted it up to plug the power through to the tender. I suspect it was snapped during assembly, and it is so fragile, I will not ask for a replacement. Rather glue a wire to the underside and use it to pivot in the hinges.

After a second or two an air pop sounds and the loco moves into neutral mode and all the extra sounds are played, such as ash pan shake, compressor etc.  You cannot move the loco in this mode, but eventually I started to understand the instructions. Just double click F6 and a double pop will tell you are back in primary mode and the loco will move off :)

The headlight is in low beam and when you go to run 1 it goes high.

Unfortunately their are no working marker lights or other lights, even red lights on the tender. The tender markers are a bit bizarre as well.

The sounds are as awfull as we guessef they would be.

The whistle is not the R whistle, more like a modified 38 to my poor ears.
The chuff is nothing like an R Chuff.
Overall I like what I have, and i will sell the sound chip after Mike gets his Loksound R Class working a little better.

about 6 out of 10 for me.  Marker lights and better sound would have made it a 8 1/2.
 Properly blackened buffers and wheels easily would have added 1 point more as well
Cheers
Rod
ps I am not disappointed. I like what I received, and the standard is better than I thought we would get. I am not a rivet counter. So more will be told in the next few days, I am certain

2013 Nov 15

2013 Nov 15
Today on the eve of my 68th Birthday at 10,33 am I got a call from the Post Master! My parcel had arrived!!




I am a little frightened to open it up :( After all three of my friends died without ever seeing their model.
I wonder if others will die of fright when they open their model? Just think it was 8 years since this was announced and the 8th anniversary of my Visa Payment will be in mid January 2014

Will I open it?  or wait till I have someone home with me?





I think I need to go shopping, the pantry is bare. I will think about it whilst I am in Wodonga
Cheers
Rod


2013/11/06

2013 Nov 5

2013 Nov 5

Moving on and now the grain silo is completed, with all track circuits working, and 5 point motors installed.


Long view.  Plesa ignore the mess as I just cleared the deck for the picture :)


The grain silo area is finished for now. All track circuits protected, and working just fine. Point motors installed and DCC controlled buttons assembled and waiting the cutting out of the perspex plates before being embedded into frame (cut outs)

In the long shot you might just notice the 5 ply is slightly lifted, and this one was done by clamping the ply down over top of a piece of 18 x 34 laid flat on then secured with risers as shown in next pics


Where their is a will, you usually find a way! Bending 5 ply smoothly!  :D


Well I might do my shopping trip tomorrow and see if I can get some more track down when I return
Cheers
Rod

2013/11/01

2013 November 1

2013 November 1  And so the balmy days of Spring have finally arrived.

Just a brief update. Spent a lot of time in the shed, mostly playing with sound and upgrading locomotives and rolling stock.
My latest acquisition was a repainted BG SOP set from Nathan Peters. Thank you Nathan :D

 Since I last posted we have started to rebuild the boards and lay some track.  It really is nice to work with a flat deck :)  Allan Jeeves again was extremely helpful, keeping me company and whose good advice and labours are much appreciated. However the tyranny of distance and Oil Company profiteering are having their effect. It costs Allan over $25 a trip to come and help, and it all adds up, doesn't it :(


So here is the first 2400 mm section added to the Helix. This time I am not in such a hurry to get something running, and so it was decided to make it a bit easy on the poor old back. All the track is laid in place, including the grain Silo. All droppers are placed and each point is set up for a motor.  (I just placed another order for 30 motors from my favourite E-Bay supplier)


 Just before moving on, I set this up to prove it would work. The rear of the train has been left on the Main, and the engine has crossed the SG and entered the Silo Yard where it uses the now vacant empty arrival sidings to access the loaded siding. It hooks on and places the loads out on the MAIN, before returning for the second sidings loads. Once all out on the Main it proceeds on to the next Station and eventually the Docks (off the layout)

So all I have to do now is connect up all the wires and fit overload bulbs, then connect to the DCC Bus. I have two double slips, one ordinary point in the Silo, as well  the points off the MAIN into the Silo to power as well
Well I am wasting time on this bloody thing again, and the soldering iron is still hot...
Cheers
Rod


2013/10/23

2013 October 23

2013 October 23 Nice day cloudy but easy to work in the shed :D

Wednesday is turning into a regular workday at my place.
Allan Jeeves again came over with some valuable advice and much needed assistance on the layout.
I think he came over to lay track on the previously completed track bases, but I had other ideas. In fact I did not know what I was thinking , because I decided to relay the track along the upper level on the long wall. The more we looked at it, the more obvious was our final decision to demolish most of it and start again.
I gently lifted all the track and laid it on the bottom level for easy recovery, and then we started rebuilding the top. In fact we demolished it and then re supported the remaining frame.    Even though the camera does not really show it, all the dips have been removed and a new baseboard mounted on top should be flat and level as I first wanted it. Let the pictures do the talking :)



Allan keeps coming back for more, and I got to say, I really appreciate it too. Got some great thoughts and we do get on well, despite me trying to drill his hand today :(





The new Bowser Junction roughed out. The left hand rail enters the branch and Bowser Station around the corner. The straight track is the main BG heading towards the section on the other main long wall, as yet not started. Temporarily it will ling into the branch on the Trentham side. The third track to the right crosses the SG on a diamond ,but instead of heading for Beechworth and Bright, it will enter a stone quarry, in a way similar to the Kilmore East facility. AS I say roughed out, but ready for smoothing out the curves and tacking it all down.

Trying to show the straight top edge. It really is straight and with 5 Ply affixed to it, should be really nice to lay track on.

Cheers
Rod

2013/10/18

2013 October 18 continues still :)

2013 October 18 and there is more

Finishing off the bottom level base boards :)

All the supports in and just waiting for the white glue to dry on an extra spacer.




This is the last bit of roadbed to tie in the whole bottom level.  Lay track and wire it up, and we can have long distance controlled movement, at last. I am determined to have this bottom section sceniced and looking good in under 8 years (three to go to beat Eureka!)



This is the left hand join to the new section just added, and shows the difference in thickness. The router got a work out rebating the 5 ply. This time I was happy with the job, and I must be getting a little less frightened of the tool, I guess :)






The right hand side join looks a bit messy, but it is glued in place, good old reliable Masonite strips save the day once again :)




This outrigger extends into the aisle where the track bed short cuts the baseboard. It took my 100kgs so it will support the track easily

This is one of the benefits of screwing everything into predrilled countersunk holes. The drill sits in the countersink and does the job in one!








Long view showing this weeks gains.

All the supports in and just waiting for the white glue to dry on an extra spacer..


Cheers
Rod


2013 October 18 continues

2013 October 18

This was some progress from Wednesday when Al Jeeves again arrived to assist me. Well he did all the work, as I had fallen in the room day before and had a crook back. So Al did the stuff at floor level. How is YOUR back today, my friend :)


What we did was replace all the twisting 3 ply with 5 ply and the new ply shows where we started from. I needed to shift all the wires and build in new supports to lift this section level and match the track out of Wodonga.


And this is the last piece to be added to complete the connection. The board is extra wide because Wodonga loop actually ends just before the start of the curve. It holds 45 vehicles and two engines! This shed is just not big enough (Jeff's shed next?   
Cheers
Rod

2013 October 18

2013 October 18   Sunny and warmer than yesterday :)

Some news from other places?

Finally on the water...
 
http://eurekamodels.blogspot.com.au/2013/10/and-now.html

My letter to Ron at Eureka, and I just could not bring it upon myself to congratulate him

Well Ron
The day has finally arrived, eh well, not just yet, but we are closer to getting our hands on these engines than we were this time last year anyway, or so it seems.
Of course I am expecting the ship to be hi-jacked by Pirates riding jet skis or perhaps sinking in a typhoon. Well that is unlikely as I have seen this ship, it is indeed huge. Could you please arrange for the container to be carried inboard, rather than seaboard as I have a funny feeling it will fall overboard if placed there :(
Seriously though!
Just to confirm that you may still send my two R Classes to
Rod Young
50 xx Court
xx
Victoria Australia.
My telephone is 02
 mobile 042
Also to confirm that I have paid in full for the engines and upgraded the price to account for sound at Corio two years ago.
The only problem I now have is the numbers that I am getting?
I think the oil burner is 719?  However I am not fussed about that.
I definitely do not want a preserved number for my coal burner, and after seeing R704 in its Exposition livery at Caulfield, I am hoping that you will have a sound version spare that I can change to? If this is possible I will be happy to accept it.
Other than that, any Number except 752 (an engine I already have) will be acceptable.
Hope this helps us both, my attempt to shave a bit more time off the long  wait.
Now to save up for the K :)
Cheers
Rod Young