2019/09/13

2019_09_13 Catch up or clean up?

2019_09_13  Accumulation of jobs and rubbish..what to do?

Ok a few days ago we had another Al-Day and accomplished a heap of work. Al seems to enjoy building a railway, but still recovering from his year long illness, makes me worry that he suffers a bit trying to twist in to places more suited for younger folk. Thank you Al you inspire me to finish this railway.

And so we installed 9 point motors and wired them all in including the live frogs.

I also completed the control panel and began adjusting the point throws using Tam Valley DCC singlet switches.

This morning, I started to complete a couple of wiring jobs and all of a sudden the accumulated rubbish caught my attention, finally.  :(




Plastics into garbage bags and wood and burnables into the fire place and burnt. But although the first picture shows a mess, the second actually shows work was done.  :)

This is about 30 minutes work, and I guess I have at least 8 hours more to do? However the major "tripping" hazard has been eliminated. (once I sweep up the dust and small bits)
  Had a fall yesterday inside the new helix, which fortunately did no damage, to me or the layout, however poor Al endured a typical PTSD gob full. Sorry mate.

I also attempted to get Al's Lima 38 Class working, however it appears to have a short and only goes a few inches and stops and starts. The tsunami sound decoder might be causing it, as I cannot find the short. Next job might be to return it to DC and see if problem persists?

Then I found a brand new Austrains T Class never been opened. I believe its one from EBay , forgotten among all the other boxes.
Forgotten how I used to add sound to these, but here I am trying to work out if a sugar cube speaker will go into the body instead of the fuel tank.


Unfortunately the loco failed on DC, and the armiture was very tight, not rotating with power applied.









Took it apart and everything looked ok



Until I found this jammed inside the motor dragging on the armiture. Perhaps the reason why it was sold and I hope I got it cheap :D

So back to the T Class. I will now fit a Liksound V4.0 with a Mike Walters sound program that I must have bought for this when I purchased it. now can the decoder fit in place of the lighting board?

Cheers
Rod


2019/09/07

2019_09_07 Finished trackwork above Helix

2019_09_07  Trackwork, wiring and some scenery discussions ;)




 Ok so on Thursday Al and I completed all the track work and connected up all 46 pairs of droppers. I dare this section to develop a dead spot!!





 Apart from the terrible curve at the far end of the platform, I am happy with how this all turned out. It is a very difficult thing to create a station on a circular board, even if it is 2.4m diameter. The servo motors which control all points here will be controlled, at least at first, with the small panel leaning up against the wall. Long 3 core aircraft wiring cables connect the servo to this switch panel, simple plug and play :)


 Because the goods shed shares the approach to the engine shed, I created a road that will hold car loads to and from shed to clear approach to engine shed if required.


 Another road was created to coal and oil locomotives and water them too.


 R707 loads with Maitland coal before watering and setting aside for next turn of duty.




Extended the shed road to store an engine till required. Was going to put a pit here, but the curve was necessary.



 Peco pit was utilized. Need to dirty it up, I guess.

We ran all sorts of trains and tested all track. To finish it off, I need to install point motors and switch the dead frogs with them. Going to use servo motors here.


SCENERY
To start to fix up and add the scenery it was decided to get all the fascia panels in place.  This will enable the ground cover to finish and it should work out well, visually.




It will also tidy up the tired old black masonite and allow a change of colour, probably a dark olive green. 


I like the bottom two :)






So we just glued the new white craft wood to the old masonite, with liquid nails and clamped it for 24 hours. Graeme trimmed the top off with a Stanley knife to match the scenery base, making adjustments where necessary.




 We also noticed that the black top valence had given way here. Re glued it and see if it holds this time. The bending might be over stressing the construction. We will have to see.


 Graeme starts to shape the tops after clamping the fascia after applying liberal amounts of glue.
Graeme also has worked out a way of recessing the point motor switches. We can drill them in when the glue drys.


 The board cut fairly well with the knife. Watch the fingers please!





We lowered the cut in front of the bridge, as the creek was flowing up hill here. Now its looking good.



It should be nice when painted green.

So thats all for now as I continue to test the new track..  eh run trains, which is something that has not happened much around here for many months :D

Cheers
Rod

2019/08/30

2019_08_30 Big project about finished,

2019_08_30  Unnamed terminus yard almost finished.



Fail proofing points








 I improved the point blade conductivity a little easier than before. Now I am lifting the tab on the blade and soldering to it. Then pushing the tab back down, and it is much easier than soldering to the blade itself.

Setting up the silo roads.


 Here is Al trimming track he has just laid and prepping the buffers.


 Installing the Auscision Goods Shed.


 WE kept stripping the screws that attached it to a board. Finally gave up and routed out a hole and sunk the board into it.
















After Al left for home, I fiddled around for a while and as well worked most of Saturday trying to work out what I could do with the yard.

Here is a video showing where I finished up. All I need do is tidy it up for a bit and connect droppers as well as point motors.

Here is how it finished up today :)

https://vimeo.com/356860282

Cheers
Rod



2019/08/26

2019_08_26 Big return trip to Caulfield for Exhibition

2019_08_26  Best Caulfield AMRA for years!

Had a great time at Caulfield picking up some goodies and meeting a lot of mates that I only seem to catch up with on this weekend each year. Moving 300 km away into the bush has consequences!

The big news for me is that Ixion are building the VR J Class and are rather well advanced showing engineering samples and hoping for an early 2020 release at about $650

Of course Phoenix have promised the D3 this year, however no samples as yet.

I picked up some Austrains 4 wheel flour pots (FJ)
Some SAR O wagons with and without red doors
Some SDS S flat cars and VR O wagons
A Eureka bobber 4 wheel NSW brake
And Tony sold me some WW2 Blitz army trucks for my Military special.

Lots of small items, buildings sound decoders, etc  which in the finish broke the Bank!

As well I purchased an IDR W class VR blue and gold modified GM engine with sound fitted.
Have to sit back and save for next year, because decided that AMRA NSW at Olympic Park is just not doable for me this year. A long tradition is coming to an end.
Traffic jams, football crowds and parking fees all contribute to a no go zone for me. Thank goodness for the Epping Rose Hill Exhibition, which for me was probably better than the last Liverpool Exhibition anyway.

I think Victoria's AMRA Exhiition has been lack lustre for several years now, however this year they seemed to have their mojo back again and I thoroughly enjoyed it once again.
Some pictures when I get a chance,

A picture of 3264 slow running after DCC fix and more about that when I get sound reinstalled. Needed a better speaker!





Cheers
Rod



2019/08/22

2019_08_22 Addendum to todays post

2019_08_22 Continues

Despite the lost time chasing non existant track problems, Al installed two more curved points, linking the third yard track as well as the shed road. We cant install that till we work out where the shed is going to sit.


 And as well we got some point motors fitted and a panel to operate them with.


 older cast servo holder


 Newer Tam Valley with micro switch for frog polarity


Tam valley mounting made from laser cut timber. It is not easy to fix underneath. The cast one much easier. 
Cheers
Rod

2019_08_22 Derailment shows up track problems?

2019_08_22 Catching up.  Derailments slow us down track or Loco at fault?

Interesting week. Al came over Tuesday last and we tackled a problem with our Tillig curved points.
Our test train was a Eureka Class 50 that was able to navigate all the track on the older section of the layout, even the rough sections. We simply believed it was a good runner... so we blamed the track.









First thing to notice, is that it is all new track. I ran out of Peco Fine Scale LH curves, however I did have a LH Tillig flexible point code 83.
The troubled Peco Fine Scale code 75  point installed. Then under it a new Peco Fine Scale code 75.
And under that the already removed Tillig code 83 NMRA standards point.



 The Tillig appears sharper however the outer rails adjacent to the blades are  fitted to flexible sleepers which hold gauge as you adjust radius, need to take care the blades maintain contact with outer rails.  The rail heights matched exactly, but the heads were different. Gentle filing fixed that easily



You can over adjust the curvature of the Tillig product, however this shows the difference was minor and well within the limitations of adjustment.

So we wasted hours blaming the point only to find out the problem was the loco. What a newby mistake to make, and all my fault. "Old Timers" for sure.

So after replacing the point (I purchased new Peco and had to wait delivery from Perth which was exactly the same time it took Yankee Dabbler to deliver his package from the States.

Ok so what was wrong with the engine?

The Eureka 50 is a metal cast loco with plastic detail. The lead truck was heavy metal and had a centering spring to hold it in the middle, not to add weight to wheels.


 Pony is metal,heavy and centered.


 Removed it and found this centering spring captured by a molded pin in the hole.


 A matching spring capture hole in top of pony.


 The centering action is actually too hard and easily pushes the tiny 88 standard wheel flanges over the head of the rail.





Like this. And it was exactly the same on the much better built expensive Tillig points.

Took the spring out and ran the engine over the whole layout without further problems.


Thanks again to Al who shouldered the brunt of the work trying to fix the track problem, which never existed.  By the way Tillig, despite my ranting, you really do make great track :)

Next post deals with an Ixion Class 32 fitted with a Locksound micro decoder, which has chuff problems as well as minimum 30kph speed.
Cheers
Rod

2019/08/08

2019_08_08 laying even more track.....

2019_08_08 We got two tracks in, wired and running.


So why so long?  Well I have some restrictions.
First I want 42 inch or more radius. Most main line is 46 or 44 inch. Unfortunately most of my problems are to do with points where I am forced to use No6 which makes long coaches look stupid and close coupling almost impossible.

Then I want to guarantee electrical contact. So every point is rewired with droppers from frog outer rails linked to inner rails and droppers attached and point blades have droppers. Eliminates requirement for blades touching to carry power.
Next is every length of track is either soldered to next track or has dropper s soldered on.  And so fish plates only hold the rail, and are not relied on to carry power.
So with two of us working, one soldering and the other getting correct readii insulating where necessary and tacking it all down on underlay.
We are both fully occupied for the day.

So some pictures. Strangely enough I actually did not see the first train operate on line.  We had some short circuits and it turned out that I had not removed the shorting wires on one point. Fortunately it was a point easily removed and fixed. But it did take an hour out of our day searching for it.
The reversing AR1 was removed and replaced with a Tam Valley duo frog juicer. But I guess it was an unnecessary change and the AR1 can be used on the bottom of the helix reversing Albury trains.



 Almost all 36" but does open out to 42" in places.


The NSW goods was stalled on the first points which were laying to run anti clockwise down the back wall. When I cleared the  fault it started to move slowly into the new track work. As I was under the layout  it was out of view, but only moving slowly. 
I was connecting up all the droppers I had pulled apart chasing the fault. And as each track section got power the little train continued on its way. When I finally crawled out from underneath, I had enough time to slow the train and bring it to a stand short of the points.

I did actually see the second train derail its way around the track. It was an Auscision 8 car Daylight set, which looked tight on the curves but  derailed in the large radius curved points.
ah well I found a few places where this happened at Trentham and Bullarto as well as other places.
Have to spend a day sorting all that out, I guess.



Little train fitted nicely into No2 road




Cheers All
Al and Rod