2014 June 15 BG connection made, finally.
At 1252 the last spike was placed in the run round road through Wodonga. All droppers are placed ready to connect into the bus :D
Should be a simple job wiring it in, because the point motors, juicers and control switches (points) are built all ready to cut into the facia...
Wooooooeeeeeee! Long time coming and now its ready tonight, perhaps to run several trains round the very big loop about 94 meters from platform and around both levels and back to the platform
Edit Actually just noticed the through road was connected in as well :) Seems I was through at least an hour or two earlier ;)
So just need to cut and secure the Platform road. Then solder in 6 more droppers.
Connect 5 juicers and 3 more control switches as well as connect the droppers to the bus.
Guess that's about 4 hours work, at my pace :)
Cheers
Rod
2014/06/15
2014/06/12
2014 June 11
2014 June 11 Tedious preparations.
I am slowly getting there. Yesterday and today I worked in the Wodonga Station area. Still have a lot of trouble working upside down. But got two servo motors installed at High Street end and despite one motor not operating, can at least enter Platform Road and Through Road, and run around.
Fitted Mono juicers and prepared two more for Signal Box end.
Drilled out for droppers, then spent another few hours on my back threading wire for all three tracks. Need to add the runaround road today after shopping.
Prepared 6 stop tail light globes, connecting the two filaments with a solid state fuse and wiring it into each track feed.
I also modified 5 Peco points (switches) by adding droppers to outer rails, frogs and point blades ready to hook into the DCC feeds for each track.
It is becoming a real problem getting down on my knees and back and working here at my age. I guess at 69 this year, I am lucky I can still do it at all.
So I am pretty pleased with how far I got. Still a gap big enough to lay 4 points before she is connected through. I almost cheated and just straight lined it through as some points will not be needed till I get the cattle race and Yard working. But I am glad I persisted and connected it through.
More later!
Cheers
Rod Young
I am slowly getting there. Yesterday and today I worked in the Wodonga Station area. Still have a lot of trouble working upside down. But got two servo motors installed at High Street end and despite one motor not operating, can at least enter Platform Road and Through Road, and run around.
Fitted Mono juicers and prepared two more for Signal Box end.
Drilled out for droppers, then spent another few hours on my back threading wire for all three tracks. Need to add the runaround road today after shopping.
Prepared 6 stop tail light globes, connecting the two filaments with a solid state fuse and wiring it into each track feed.
I also modified 5 Peco points (switches) by adding droppers to outer rails, frogs and point blades ready to hook into the DCC feeds for each track.
It is becoming a real problem getting down on my knees and back and working here at my age. I guess at 69 this year, I am lucky I can still do it at all.
So I am pretty pleased with how far I got. Still a gap big enough to lay 4 points before she is connected through. I almost cheated and just straight lined it through as some points will not be needed till I get the cattle race and Yard working. But I am glad I persisted and connected it through.
More later!
Cheers
Rod Young
2014/06/09
2014 June 9 Monday Queens Birthday
2014-06-09
Managed to get a couple days work on the layout despite a bad dose of the Flu and a nose that dripped like a tap. UGH!!
So track now reaches into Wodonga Platform and I am less than two meters of track to lay to join the first full BG loop up. Unfortunately their are 6 pairs of points in that section and it is taking time to set them all in place.
I wired in the BG track through the Coal Siding and started working back into the siding itself. Their is probably another few days work there after I get trains circulating.
Hopefully feel better tomorrow and get the Wodonga connection in?
Cheers
Rod
Managed to get a couple days work on the layout despite a bad dose of the Flu and a nose that dripped like a tap. UGH!!
So track now reaches into Wodonga Platform and I am less than two meters of track to lay to join the first full BG loop up. Unfortunately their are 6 pairs of points in that section and it is taking time to set them all in place.
I wired in the BG track through the Coal Siding and started working back into the siding itself. Their is probably another few days work there after I get trains circulating.
Hopefully feel better tomorrow and get the Wodonga connection in?
Cheers
Rod
2014/06/03
2014 June 3
So what has happened?
Hobsons Bay Easter 2014 Exhibition has run extremely well.
Couple of special meetings at Hobsons Bay sorting out the Club future.
Finished up taking the train to Melbourne Sunday for the last one and returning same day1..Too old for this ;)
Murray Railways Modellers Exhibition for 2014 has come and gone...
Bit of Track laying.....
Still working on the wiring ......
Burnt out another bogie. This time a Y class. Melted a gear and needs a replacement.
Worked out how I shorted out the Y Class.
Turned out it was the second engine in a consist and it pushed the first loco into a dead section of track, and then sat a wheel on the rail gap.
I have a Digitrax system which usually will protect the loco by shutting down. However this insulated section marked the entry into a district operated by a second DB150 control station. So far so good you might think? However the second DB150 was found to have been wired incorrectly. That is the DCC ring main was reversed, connecting black to red etc. Now how the hell did I do that?
A full check on the whole layout found some other minor errors too. Anyway all is good and the Y Class that hit the floor a year ago will be the source of a new axle to get Y139 back on the rails.
So now I am back into rewiring the Wodonga Yards, I might as well keep going :)
Last week we accomplished two jobs Jim and I got rid of the store bought brackets supporting the top level of the center module and that opens up the opportunity of finally wiring up the tracks and getting both stations operational.
The second job was done when Al came to give a hand. We widened the Coal Siding to help fit in the rest of the Shell Siding and add the Super Siding.
Here I show a few pictures of the goings on at my little railway.
And only a few meters of rail to lay before trains can circulate as well :D
The other day Graeme and Norma came up from the smoke for a visit. I was telling Graeme how difficult it was becoming for me to wire up the undersides of the yard. Imagine if you will the bottom shelf as cluttered as the shelf on the other side?
Norma brought us in a cup of coffee and heard the conversation, and says quick as you like... I don't really see a problem! Just clean the junk of the shelf and scoot yourself along underneath. I think your arms will be long enough to easily do what you need to do. Don't you think? Well Graeme and I just looked at each other and back to Norma..Why didn't we think about that? :( So the deck is cleared and I have scooted the length of the boards several times and it works well. Guess we were too close to the action? Or maybe not close enough? A real Duh!! moment for me at least.
Whilst Graeme was here we laid down the SG loop and the BG. All I need to do is wire in the loop points and the cripple road on the SG.
The BG is linked into Wodonga, and all I need to do now is fit in the three roads through Wodonga Station to complete the first full circuit of the Railway. About three lengths of Peco to complete the loop, about 8 lengths to get sidings in Wodonga, to make it reasonably operational. Remembering the Coal siding at Wodonga has only one entry facing Melbourne. Trains are hauled back to Wodonga in most cases before departure, although Melbourne trains can arrive straight in. Wodonga Coal siding has been widened to allow these arrivals.
My mate Jim, made up some new brackets to replace the eyesores I bought from Bunnings, and they work just fine.
Here Jim poses with one of the old brackets
Jim takes a few pictures whilst I admire the new supports.
*This picture tells a lie :) Their is no slope at all, the bubble on the level sits plumb in the middle ;)
The supports will be almost invisible once I plaster over them and prepare the back drops. I can now string in my LED lighting as well.
The supports were built to collapse slightly under the weight of the upper deck. It seems to have worked out almost correct in all but one case. We will heat it up and add another few degrees. But the layout is held very nicely and these supports stay under tension. I just saw those fastening heads. Need to replace them with countersunk screw heads before I can plaster over, I guess.
Jim welded up some new brackets and we just finished installing them. The posed picture shows the old brackets which did look pretty awful.
Interruptions... I got a new Walker and it needs a sound chip. Its here and all it needs is to be fitted :)
Preparing the extension
Fixing the extension.
Applying the ends
Under the coal siding The heavy black 35 amp cable and the similar Red cable are the DCC bus lines connected to the DCC Command Station.
The smaller gauge wires are the short protected local feeds, one for each track. Now all I have to do is join the black and red droppers to the correct feeds :) That job starts today. Before I started this post I installed the Hex juicers for the points. You can just see the multi-coloured fine wires dropping from each set of points in the distance. Unfortunately I will have to solder wires to extend the cables back to the juicer. I avoid soldering especially in confined spaces like this. I will have to be on my back on the lower rack.
So with the arrival of the first train at the Coal Siding, all we have to do is wire it up :(
All it needs now is the droppers and the Hex Juicers to pass through on the main. Definitely my next job.Well hopefully more to show in the next few days... Although Epping Exhibition is on again next weekend ;)
Cheers
Rod Young
2014/05/21
2014_05_21 Update
2014_05_21 Update
Just a small update.
The frustrations of my G Class and the Train Builder N Class have been weighing me down! So both projects are in the clipper bins which not only keep them fresh (TM), but guarantee their various parts are not lost.
It was something I had to do, and it has helped. For about the last 5 days I have suffered sinus and a runny nose, that much so, that I could do little more than lay on the couch with tissues jammed up each nostril to stop the constant dripping. Occasionally, the odd bit of relief, allowed me back into the shed and I managed to lay another 10 meters of track.
I have reached the House Creek area of Wodonga and only have the Wodonga Station area to lay to complete my first BG track on the bottom level. This will indeed be a great day when the track is finally connected. However my drawings need fixing and I need to sort out my main line connection to the shed and the turn table before advancing further.
When I tried to run the first train through on the new track I found several new shorts. I spent about two hours last night unplugging cables to locate the source of the short. Although the track has not yet connected the full loop (which would create a reversing loop) The power cables underneath in fact might be causing the short.
I know that once the Wodonga Station is connected in, I will have to fix the reverse loop wiring, but will have to discover why I suddenly have multiple shorts at the moment. Hopefully my nose has repaired itself, and I will get a few hours in the shed and fix it today.
Cheers
Rod
Just a small update.
The frustrations of my G Class and the Train Builder N Class have been weighing me down! So both projects are in the clipper bins which not only keep them fresh (TM), but guarantee their various parts are not lost.
It was something I had to do, and it has helped. For about the last 5 days I have suffered sinus and a runny nose, that much so, that I could do little more than lay on the couch with tissues jammed up each nostril to stop the constant dripping. Occasionally, the odd bit of relief, allowed me back into the shed and I managed to lay another 10 meters of track.
I have reached the House Creek area of Wodonga and only have the Wodonga Station area to lay to complete my first BG track on the bottom level. This will indeed be a great day when the track is finally connected. However my drawings need fixing and I need to sort out my main line connection to the shed and the turn table before advancing further.
When I tried to run the first train through on the new track I found several new shorts. I spent about two hours last night unplugging cables to locate the source of the short. Although the track has not yet connected the full loop (which would create a reversing loop) The power cables underneath in fact might be causing the short.
I know that once the Wodonga Station is connected in, I will have to fix the reverse loop wiring, but will have to discover why I suddenly have multiple shorts at the moment. Hopefully my nose has repaired itself, and I will get a few hours in the shed and fix it today.
Cheers
Rod
2014/04/23
2014_04_23 Remembering the Exhibition
Back from the Exhibition. To be honest I did not do a lot of
physical work during the show, but exhausted myself setting up and
pulling it down. Just slept in till after 11.00 two days in a row.
I really hope that most of you appreciate the effort we all put into running this Exhibition.
I must admit that I was no confident that it would be as successful as it was, but Club Treasurer Paul Hawdon and Vice President Michael Churchley did produce the goods and pull it all together.
For those who found it easy to show criticism? Well do a better one and lets see how you feel after it ;)
These are the pictures of my booty,which I am really pleased with.
12 Auscision U Vans at $20 each, is possibly the bargain of the show.
At the back you will see 3 On Track box vans which I won in the swindle.
Behind Three gold boxes to store them all in ($100)
I got problems with the flats. They will not sit on the track and move. I suspect it is a coupler problem with the uncoupling pin hanging too low. I sure hope the coupler is not low. I need to find the gauge.
4 packs of 3, SDS VOCX flats. That's 12 flats! half are three letter codes and all marked as VR.
This picture shows the peculiar shape of the uncoupling pin on the KD, despite the derailed truck it is almost sitting on the sleeper. Two minute fix (I hope) if I can find the pliers and test tool :(
WALKER trailer
Ex Alan Curtis Walker RM trailer, beaut model and was proud to bring this one home.
Some Books to add to the collection ;) Bill Lewis has just released the middle one "Along the Straight"
The BGM D3
Now the special piece to beat the rest :)
After Geoff from Shrike Models announced the D3 was not going to be the next model, I asked John Della from Precision if he had a brass D3 in black, and he did In fact he had two of them.
I bought one which had been owned by one of the original owners of BGM and it appears never used. Really stoked that John Della would let me have it, as it was supposed to be offered on his web site.
Very Happy Thank you John :)
I really hope that most of you appreciate the effort we all put into running this Exhibition.
I must admit that I was no confident that it would be as successful as it was, but Club Treasurer Paul Hawdon and Vice President Michael Churchley did produce the goods and pull it all together.
For those who found it easy to show criticism? Well do a better one and lets see how you feel after it ;)
These are the pictures of my booty,which I am really pleased with.
12 Auscision U Vans at $20 each, is possibly the bargain of the show.
At the back you will see 3 On Track box vans which I won in the swindle.
Behind Three gold boxes to store them all in ($100)
I got problems with the flats. They will not sit on the track and move. I suspect it is a coupler problem with the uncoupling pin hanging too low. I sure hope the coupler is not low. I need to find the gauge.
4 packs of 3, SDS VOCX flats. That's 12 flats! half are three letter codes and all marked as VR.
This picture shows the peculiar shape of the uncoupling pin on the KD, despite the derailed truck it is almost sitting on the sleeper. Two minute fix (I hope) if I can find the pliers and test tool :(
WALKER trailer
Ex Alan Curtis Walker RM trailer, beaut model and was proud to bring this one home.
Some Books to add to the collection ;) Bill Lewis has just released the middle one "Along the Straight"
The BGM D3
Now the special piece to beat the rest :)
After Geoff from Shrike Models announced the D3 was not going to be the next model, I asked John Della from Precision if he had a brass D3 in black, and he did In fact he had two of them.
I bought one which had been owned by one of the original owners of BGM and it appears never used. Really stoked that John Della would let me have it, as it was supposed to be offered on his web site.
Very Happy Thank you John :)
2014_04_21 LaTrobe Easter Exhibition
2014 Easter 21/4/2014
LaTrobe Campus HBMRC Exhibition 2014
BINALONG
Fogarty's Gap
Healesville
Wallan
Cheers!
LaTrobe Campus HBMRC Exhibition 2014
BINALONG
Fogarty's Gap
Healesville
Wallan
Cheers!
Subscribe to:
Posts (Atom)





















































