2016_04_14 Al and I started the new benches.
We had a couple of L girders from elsewhere, and built these up into a solid bench. Cut out three more benches and assembled one of them. Not a bad days work :)
When we finish the wall, on Saturday, I will remove the legs against the wall and fix the L Girder to the noggins behind the plaster.
The out rigger supports will be cut shorter after the top level roadbed is fixed. This will not happen till the 5 ply tops are fixed on the bottom, and the track is installed, wired in and sceniced.
Cheers
Rod
2016/04/14
2016_04_13 A new model arrives
2016_04_13 My mate from Dynon sold me some nicely detailed weathered goofeys!
Thanks Steve Bucton. All I need to do is weather up another 36 to match them :D
Some friends have recently been robbed.
This shot shows two high definition cameras installed in my shed. They are wiFi connected to the modem in the shed which all runs off a battery backed up power supply. If you activate the cameras a message goes to my i-phone asking me if I would like to cycle through the 8 cameras. only fitting 5 at this time to watch trains out of sight and make this layout operable by one person. But a nice security feature was found when I started to look into it. 1080 HD is recorded to an 8 track video recorder fitted with a terabyte HD to store images.
Cheers
Rod
Thanks Steve Bucton. All I need to do is weather up another 36 to match them :D
Some friends have recently been robbed.
This shot shows two high definition cameras installed in my shed. They are wiFi connected to the modem in the shed which all runs off a battery backed up power supply. If you activate the cameras a message goes to my i-phone asking me if I would like to cycle through the 8 cameras. only fitting 5 at this time to watch trains out of sight and make this layout operable by one person. But a nice security feature was found when I started to look into it. 1080 HD is recorded to an 8 track video recorder fitted with a terabyte HD to store images.
Cheers
Rod
2016/04/09
2016_04_09 SDS 80 foot flats
2016_04_09
NSWPTC JCW 80' Container Wagon
Heard at recent exhibition some were complaining about constant derailments, so I spent some time checking these out.
As they are very long wagons, and because the bogies sit a long way behind the couplings, I decided to run some experiments with the Kadee coupler gauge.
When I first got these wagons, I noticed that the uncoupling bar hung low scraping the top of the height gauge, but left them alone, as the coupler did not appear to be fouling, just touching.
So I spent an hour running the train around the layout , through crossovers and slips to see what would happen. In fact I had constant derailments as the wagons started tipping over as the couplers hit the side stops.
On further examination, I noticed the coupler bars were hitting the tops of the rails. So I again checked the wagons, and found them to be ok..
The Auscision X Class loco was another story. The short coupler was not allowing the JCW to move aside, and again the problem appeared to be the kadee uncoupling bar. I had another Kadee with this bar cut off, so I installed that coupler and the X was able to get the JCW through the crossover without derailing it.
So I then adjusted all the uncoupling bars much higher than the gauge required and tested the train again. Problem fixed and the wagons now perform flawlessly.
All I can think is the overhanging coupler must move up and down depending on how level the track is, and that caused the bars to catch on the points. Problem solved!!
Here you can see the pin is higher than the plate and should not be able to foul points and crossings
Here I am bending the bar horizontally, which is higher than recommended (but I don't use magnetic un-couplers anyway)
Check out the distance between the mounting point of the bogie and the working face of the coupling. I think that when the opposite end of the wagon starts to climb, the coupling moves towards the fouling point, and eh? fouls :D
The wall
Another 6m, ready to sand and apply finishing plaster and paint. Graeme Schultz was a welcome visitor today supplying his labor and expertise. Thanks again ,mate :D
Cheers
Rod
NSWPTC JCW 80' Container Wagon
Heard at recent exhibition some were complaining about constant derailments, so I spent some time checking these out.
As they are very long wagons, and because the bogies sit a long way behind the couplings, I decided to run some experiments with the Kadee coupler gauge.
When I first got these wagons, I noticed that the uncoupling bar hung low scraping the top of the height gauge, but left them alone, as the coupler did not appear to be fouling, just touching.
So I spent an hour running the train around the layout , through crossovers and slips to see what would happen. In fact I had constant derailments as the wagons started tipping over as the couplers hit the side stops.
On further examination, I noticed the coupler bars were hitting the tops of the rails. So I again checked the wagons, and found them to be ok..
The Auscision X Class loco was another story. The short coupler was not allowing the JCW to move aside, and again the problem appeared to be the kadee uncoupling bar. I had another Kadee with this bar cut off, so I installed that coupler and the X was able to get the JCW through the crossover without derailing it.
So I then adjusted all the uncoupling bars much higher than the gauge required and tested the train again. Problem fixed and the wagons now perform flawlessly.
All I can think is the overhanging coupler must move up and down depending on how level the track is, and that caused the bars to catch on the points. Problem solved!!
Here you can see the pin is higher than the plate and should not be able to foul points and crossings
Here I am bending the bar horizontally, which is higher than recommended (but I don't use magnetic un-couplers anyway)
Check out the distance between the mounting point of the bogie and the working face of the coupling. I think that when the opposite end of the wagon starts to climb, the coupling moves towards the fouling point, and eh? fouls :D
The wall
Another 6m, ready to sand and apply finishing plaster and paint. Graeme Schultz was a welcome visitor today supplying his labor and expertise. Thanks again ,mate :D
Cheers
Rod
2016/04/03
2016_04_03
2016_04_03 One little job today.
My Son and Son in law combined to get the plaster in place ready for cutting down during the week.
Cheers
Rod
My Son and Son in law combined to get the plaster in place ready for cutting down during the week.
Cheers
Rod
2016/04/01
2016_04_01 First Train enters Albury
2016_04_01 Shut up Mr T. Fools day ends at midday!
Ok truth is the panels are all up and all I need to do now is attach the plaster.
Not sure what I will do in the last section. I might just insulate the wall and use the extra space for the helix. Maybe not.....
Now next job is to haul the two 6m sheets of plaster in ;)
I think I just might have that covered. My son is visiting :D
Cheers
Rod
Ok truth is the panels are all up and all I need to do now is attach the plaster.
Not sure what I will do in the last section. I might just insulate the wall and use the extra space for the helix. Maybe not.....
Now next job is to haul the two 6m sheets of plaster in ;)
I think I just might have that covered. My son is visiting :D
Cheers
Rod
2016/03/31
2016_03_31 Marches on.....
2016_03_31
Another few days , another hours work. Got my Son and Grand son visiting from Townsville. Think that's where they are now, recently Sydney, heading closer to real home Port Douglas, I think ;)
Just continuing on with the wall. But have also been playing around with Decoder pro, and spent many hours trying to clear up some sound decoder problems. Plenty of places to go see experts do this, so I will not try to say much about it
If you are on Face Book, an Australian DCC site can be found here:- DCC Downunder
search title if not connecting
------------------------------------------------------------------------------------------------
So one wall panel fixed in place, and one to go :) Before another 6m of plaster can be installed.
This one temporarily fixed. Will go out and drop it to clad it with insulation board after lunch. The cooler weather is really nice ;)
Had to pre install the sign before fixing panel into wall. Should have drilled new holes and lifted it. Too late now.
Cheers
Rod
Another few days , another hours work. Got my Son and Grand son visiting from Townsville. Think that's where they are now, recently Sydney, heading closer to real home Port Douglas, I think ;)
Just continuing on with the wall. But have also been playing around with Decoder pro, and spent many hours trying to clear up some sound decoder problems. Plenty of places to go see experts do this, so I will not try to say much about it
If you are on Face Book, an Australian DCC site can be found here:- DCC Downunder
search title if not connecting
------------------------------------------------------------------------------------------------
So one wall panel fixed in place, and one to go :) Before another 6m of plaster can be installed.
This one temporarily fixed. Will go out and drop it to clad it with insulation board after lunch. The cooler weather is really nice ;)
Had to pre install the sign before fixing panel into wall. Should have drilled new holes and lifted it. Too late now.
Cheers
Rod
2016/03/29
2016_03_28 just a little bit today
2016_03_28
Had to secure frame to floor and wall, them mount support struts in place, and block them to wall for strength.
The struts are in place and leveled . Had to mount them 100mm lower as the SG is dropping that much and will enter the helix at about 1015mm.
So that's 12 m of framing (only 3m to go :) )
The blocks screwed to the wall will help strengthen the supports.
Now I have to remove both frames and cut out the insulation panels to be liquid nailed to the back
Then fix them back into position to fit another two sheets of plaster on the front.
Thank goodness the weather is much nicer now.
Cheers
Rod Young
Had to secure frame to floor and wall, them mount support struts in place, and block them to wall for strength.
The struts are in place and leveled . Had to mount them 100mm lower as the SG is dropping that much and will enter the helix at about 1015mm.
So that's 12 m of framing (only 3m to go :) )
The blocks screwed to the wall will help strengthen the supports.
Now I have to remove both frames and cut out the insulation panels to be liquid nailed to the back
Then fix them back into position to fit another two sheets of plaster on the front.
Thank goodness the weather is much nicer now.
Cheers
Rod Young
2016/03/21
2016_03_21-Climate Change :)
2016_03_21 So the weather changed Rain, high strength winds which weeded out trees with small roots, then went from 36C on Tuesday to 24C on Wednesday and 8C to 18C on Thursday.
So that means I have to catch up on the last three months at least!
The Wall !! Wished I had some East Germans to help ;)
But I do hate pulling out whatever I did last week.
So the two spacers installed a month ago had to be removed. I had placed them in position flat because I half remembered a reason to do this from the first section of wall Al and I built and Graeme helped us fit a few months back
Whilst waiting for it to cool down I remembered we set the cross pieces (noggins) in place to account for the benches that would be screwed to them later on. We forgot that the plaster had to be joined and decided to place one noggin at the join height and lay it flat to give plenty of purchase to the plaster cement and screws. I then removed those already installed and replaced them in their correct position.
This photo also shows how I keep the frame flush with the brick pillar, with two flat boards first screwed to the bricks and then screwed to the frame.
When I get some more green spaghetti I can screw the frame into the inside of the piers.
So the bottom noggin will support the SG Yard (Albury) table top. and the join between two sheets of plaster. These have to be flush and flush with the wall to support the join.
I decided (because I am naturally sloppy) to set everything out neatly, and see what happened. So far so good ;)
The right angle clamp holds the noggin in position at the right height and flush with frame.
the block of wood on left holds the noggin level and at the right height. It also allows me to use a nail gun to fix the noggin in place. I need to hold it flush though (Really dont like my hand being so close to the gun though!
Cheap Bunnings Gun $70 on EBay helps my arthritus a little and secures everything nicely.
Again the wood screwed under the left end holds the level in the noggin when the gun blasts a nail into place. Might patent that one. Just need to remember to keep the end flush with the upright
Blurred bugger! but again keep the frame flush and drive nails from other side.
(How does it blur on auto and on a timer, on a tripod, but it did not flash either)
Ok back to the shed friends. 4 noggins in place 12 to go!
Cheers
Rod
So that means I have to catch up on the last three months at least!
The Wall !! Wished I had some East Germans to help ;)
But I do hate pulling out whatever I did last week.
So the two spacers installed a month ago had to be removed. I had placed them in position flat because I half remembered a reason to do this from the first section of wall Al and I built and Graeme helped us fit a few months back
Whilst waiting for it to cool down I remembered we set the cross pieces (noggins) in place to account for the benches that would be screwed to them later on. We forgot that the plaster had to be joined and decided to place one noggin at the join height and lay it flat to give plenty of purchase to the plaster cement and screws. I then removed those already installed and replaced them in their correct position.
This photo also shows how I keep the frame flush with the brick pillar, with two flat boards first screwed to the bricks and then screwed to the frame.
When I get some more green spaghetti I can screw the frame into the inside of the piers.
So the bottom noggin will support the SG Yard (Albury) table top. and the join between two sheets of plaster. These have to be flush and flush with the wall to support the join.
I decided (because I am naturally sloppy) to set everything out neatly, and see what happened. So far so good ;)
The right angle clamp holds the noggin in position at the right height and flush with frame.
the block of wood on left holds the noggin level and at the right height. It also allows me to use a nail gun to fix the noggin in place. I need to hold it flush though (Really dont like my hand being so close to the gun though!
Cheap Bunnings Gun $70 on EBay helps my arthritus a little and secures everything nicely.
Again the wood screwed under the left end holds the level in the noggin when the gun blasts a nail into place. Might patent that one. Just need to remember to keep the end flush with the upright
Blurred bugger! but again keep the frame flush and drive nails from other side.
(How does it blur on auto and on a timer, on a tripod, but it did not flash either)
Ok back to the shed friends. 4 noggins in place 12 to go!
Cheers
Rod
2016/03/17
Subscribe to:
Posts (Atom)

































































