2016_12_12 "Al-Day" moves to Monday this once only. Al arrived and we finished off Kilmore East and started to tidy up the Silos, amongst other things.
As I write this entry, just had a nice conversation with Peter Birthisel from Warrnambool (about)
Hope you do get to visit, you will be welcome.
Ok so what did we achieve today? Al manned the tack hammer and the Dremel, and fitted track into place.
My job was to keep ahead soldering droppers to points, and connecting up point motors and wiring them in.
We did a heap of work. Al's track work is extremely good. I am thinking of hiring him out :)
Pictures will tell the story :D
Ok. The track on the top left is the branch line exiting the three way point, which is going to represent my Bowser Station.
The next track to right is the Main North East BG.
The next is the Main North East S.G..line
The third leg of the three way wont take you to Bright, however it does lead to a 21 hopper Apex Quarry siding.
Showing short head shunt.
The long straight section top two tracks will locate the Loading shed.
Loco Run a Round fits X or S plus a T type loco. Normal power in my era.
What's next mate, says Al ;). Well, as you asked, the grain silo area needs a rebuild?
So we used up the last couple of hours tacking down all the points, joining in the straights to connect it all up, and setting up for the point motors.
The empty storage roads far end, need to be replaced now that the d'slip is mounted.
Then I need to fit 5 Tortoise machines and one DCC singlet. (servo motor)
Loaded storage roads are a bit short. Might have to extend the road another 600mm.
Al built this section. The SG crossover was in, but all the rest including the nice straight line through the yard is all Al's work. Excellent work!
That will do me for tonight.
Cheers
Rod
No comments:
Post a Comment
All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D