2021/10/09

2021_10_09

 2021_10_09  OK need to cross SG trains here!!


Too many trains and not enough storage ;)

Aim today was to get a loop in and running. However I ran out of energy and light about the same time.

















What was happening? Trains were being stored in track 2 (SG) on the old helix. Could fit up to 4 trains here, except they all needed to run in same direction. Track 1 (SG) was the through track in both directions.   Thus I needed to build the new SG loop to cross trains. It should fix the bottleneck. The existing SG track becomes the loop. Minor adjustments to the BG and the new track just needs droppers and the point to be connected. Now what will I call this loop??Maybe Chiltern?
Cheers                                                                                                                                                      Rod

No comments:

Post a Comment

All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D