2017/04/10

2017_04_09 Visuals? Changing the look!

2017_04_09 Kept moving on the wiring side, installing sound units, sorting out the bridges and building more walls

say it with pictures...


 Little farm off a road with a shearing shed on other side. Main road comes under the line via an old brick bridge, which appeared to be upgraded with a steel deck recently. The H Beam is large enough to sit neatly over the 12 mm ply. Nice fit between brick piers as well.



 I dulled down the plastic structure by spraying it with water and rubbing plaster all over it. I then waited for it to dry and then rubbed the plaster off with a dry cloth


When I fit the wing walls and bulk it up with foam, I will finish the brickwork off by final clean with a damp cloth. Then glue on the stone caps and it should look ok.

Walls? Graeme came for a visit Saturday. Had an enjoyable session chatting about all sorts of things, but Graeme got his corners in...





I forgot to take a picture of it finished. All the edges were plastered up, readying the job for sanding and painting.

We had a bridge to help cover the double line opening above. Unfortunately we dropped it. But it should look great blended into the back scene


Bridge  ??  try tunnel mouth  ;)


Its a concrete structure, and what makes it stand out is the marks formed by the boxing framework constructed to hold the concrete pour in place, which are quite visible on the tunnel face,
Cheers
Rod

2017/04/05

2017_04_04 Hooking up the branch terminal

2017_04_04 HoneySuckle bolt together and install. (Auscision News)

STOP PRESS
Auscision are showing off their latest (best yet)





 Production Paints. I don't think they will change much on these. Hopefully depending on production slots, earliest June? Most likely August for Caulfield.... Anyone?

Al and I pulled HoneySuckle down and connected up the DCC and the wiring looms. Then bolted two modules together, and lifted up the two pairs and placed them in position. When all tracks were lined up, and the two pairs were wired together with provided jumpers, we bolted them together after lining them up.






The lever frame was temporarily left in position. However it will be removed and replaced with a new frame mounted lower down and to right of module, built into scenery.


ok after months spent on this project, its in and we only need to know that the electrics are still ok.
Don't be surprised if it takes some time for us to test it. We want to move on for a while.
Thanks to Al as always for lending me so much support and helping to move this layout along.



Whilst on the trestles, we installed the points and fixed the new track for the turntable in position.
Got a hole to fill and another almost the same, but on the other side and a foot to the right of picture.
Cheers
Rod Young

2017/04/02

2017_04_02 Some Videos

2017_04_02 Ok you saw N492 climbing the grade?

It was time to move around the curve to into Trentham. And there lies another story, hurt feelings on FacePoop where I sought advice on how to fix it et.c etc.

Most would have seen this one....

N492 Climbs the grade!

https://vimeo.com/211154057


Here is the problem....

The Problem?

https://vimeo.com/210554258


And here is it running (almost)

Almost fixed :)

https://vimeo.com/211151258

 Just a defect in the track and a short to fix, and it will be perfect.

Cheers
Rod

2017/04/01

2017_04_01- Was I fooled...?

2017_03_01   Graeme came for a look and stayed a while and he brought some tools, and so...





With Al working his way into Albury yard, I had to clear  the decks once more. Where am I going to put the stuff? I will get some more tubs, and hopefully find a way to clear the Albury yard.

And we also need to clear the floor for the new helix as well.  So Graeme and I cleared the floor and opened up some space under the benches to get rid of some of the boxes, already loaded.


Ok almost clear. The cut road bed will be used in the Helix.


And the boxes went to the last open space under the layout on the other side. The beauty of the bins, is that they simply can be rolled out if I need to get at the wiring, or to access the bins

Cheers
Rod

2017/03/31

2017_03_31 And so March has passed us by (almost)

2017_03_31 A quiet day, kids start holidays, so the bus is an hour earlier than usual. The posty advises my parcel that left Turkey on Friday is here.

But I did get the chance to visit the hardware and get some screws to attach bogies to Al.s  BS car. I needed to fit better wheels. The brass ones fitted were just too sloppy.
At the same time I looked at my fleet of Victorian S Cars and worked out a plan, to upgrade them with close fitting couplers, interiors and better bogies.

Then I opened my parcel.  I bet not many of you have found a reason to deal with Turkey? Well I can tell you this is my fourth purchase and this mob is a pleasure to deal with. So much so, I think I might give them a free add :D


DHL satchel very fast and much cheaper than Turkish post. Maybe more reliable too?


Very heavy weight box, protects contents, as with every purchase made.


Packed tightly, great instructions.

 Pleasant looking accurately produced product.


A free gift! Now that's old fashioned good business sense.


Now all I got to do is see if I can make it work as well as their video shows it can work :)





And for those who would like to read the literature in print?

Ballast spreader carriage
Ballast Glue Application Carriage

Cheers
Rod Young

2017/03/30

2017_03_30 Alday...allday :)

2017_03_30  Cooler, blue sky day. Two track laying teams, and then some carriage maintenance.



Level crossing track renewed and point installed and motored. Just needs wiring.


I decided not to go with the filler. Not sure I did the right thing though.. The new track is slightly, perhaps 2 mm, lower than the old track.. thinking... thinking...


From this angle it is not so bad, and from 5 feet away and eyeballing it, not so bad also.



However the camera shows a different story. The reverse camber was built in originally. I am not going to fix it. I need to keep some of the original track in, and its reliable, everything goes through it ok.


Al continued on with the Wodonga to Albury link and had a lot of trouble getting the track fixed to the bridge girders. Finished up trying several glues. finally fixing it with supa-glue. I had several types but Al was not able to make it stick. Like always, though, he persevered, and Loktite premium did the job. Other supa-glue's we tried were taking too long to go off, and it was definitely not a simple job, because of it.  


You cannot keep Al talking for long. Back into it and now he has turned the corner into Albury.


The approach is all fixed down just needs droppers to be connected.

Of course we would like to start laying Albury yard. However that creates a not so new problem. Over the months the Albury Yard has become a dumping spot. and I need to clear the mess... but where too? I am running out of places to store stuff, and storage bins!


Ah wrong bench, but you get the idea! You can't build on the bench till you clear it off, and to clear it off, you need to find somewhere to store it, and you need to remember where you stored it all  :( 
Thanks again, Al for another great day?

 Where are you Al?
Oh he is fixing up Honeysuckle, making it safe to remove the modules , to connect them all up, and bolt them together, and fix them in place, our next job!
What was I doing?  Playing around with some Lima 12 wheelers (tams) trying to get them to stay on the track. We fitted KD's and scale wheels, but the bogies were fouling on the couplers on curves. Al is going to see how they run on his layout.
And so another productive Thursday, and a heap of work done...  Closer to running trains.. even  :D
Cheers
Rod

2017/03/29

2017_03_29 Some reconstruction and some playing?

2017_03_29   The track gangs  are busy in Trentham


Unfortunately cannot fix the old hand laid track, so the gangs moved in to upgrade the area with  pre built 70 pound points. Line is expected to reopen shortly!


The original layout used soft caneite as underbed, laid very thin sleepers on top and spiked it all into place.


And so I have had to scrape out the top layer of Caneite to lower the flexi track to the same height as the track was originally
 

After cutting out the track pieces to fit, I will then lay coloured "No More Gaps" under the track, partly to seal the caneite, but to level the roadbed to secure the track in correct position. Might have to use card board to stop filler from coming up through sleepers though (so much for colours Ha Ha!)

And some fun

 Google destroyed Video however Vimeo....

And some special advertising.
The bloody C took a great Dynon Engineman too early from us a few years back. In NSW we had the log book cartoonist who decorated all the log books, first and last page for some years with hand drawn cartoons ,all original and all were recognised by Engineman as what the job had turned into.
We in Victoria amongst others had our own Rick Kaleta. His son is trying to sort many of them into a book, and I thought a lot of people might want to share a part of this and buy a copy. You cannot help to understand what makes a good engineman. You will love it as we all do on the Rail side.
Let me quote our Mr Hinch
"Good evening all. I am delighted to announce that after about 4 years of toil, the works of the late Ricky Kaleta are soon to be available in book form.Ricks son David Kaleta (V/Line Driver) has done a massive job of compiling this book which will include 150 of Ricks drawings including all of those wonderful caricatures of Enginemen and others which once adorned the walls of South Dynon and the Fuel Point. The approximate cost will be $40 give or take a few bucks. This will be a collectors classic for every Engineman and rail enthusiast as there will be a limited print run. All proceeds from the book will go to a cancer research institution. Please spread this message far and wide as we really want this to be a success both for cancer research and Ricks memory. Please text or phone your pledge to Dave Kaleta on 0433646491. Thanks and regards Michael Hinch."

and some samples?  :D Why not :)





 Rest in Peace Ricky, you were a great engineman, and we loved you mate!

Cheers
Rod