2014/07/04

2014_07_04 (continues)



2014 July 4th at about 8.30pm Work ends for the day :)

set about 10 m of track after tweaking the roadbed, and mounted two points. Wired two more ready to plant tomorrow.  Track fixed down and insulated. Just need 10 pairs of droppers and the point motors installed, and lay another 6 m of track to connect in on the Bowser end.
Hopefully this will be working tomorrow.
I just ran a train in using jumper cables to get an idea of the grade and how it looks. I think I am really pleased with it :)









Cheers
Rod