2013/07/24

2013 July 24

2013 July 24 Wednesday Cold and sunny after a week of extreme
 cold weather and rain!



 Peco track straight out of the box!
Its a simple thing to lay track right?
Buy it, unpack it, place rail joiners on it and straighten it or curve it and lay it on a hard flat surface? ........  Yeah right :(

Rail Joiners are not going on this piece of track without a little preparation.





First thing to do is cut away the plastic on the first sleeper, and create a gap for the rail joiner. I find it easier to do this before laying it. Prepare both ends on straight track. On curved track, you need to remove the extra length on the inside rail, and remove extra sleepers before fixing the rail joiners.

I then solder a dropper on each side of the rail close to one end. On curved track it helps to curve it before doing this.

Then using the wonderful Trackright underlay, and straight edges and track gauges, I simply fix it in place with tacks. These can be removed if you want, after the ballast is dry gluing everything in place.







Spent a couple of days in the shed after returning from Adelaide where I had a pleasant time catching up with old friends.

So I might just post some pictures of Adelaide and a larger scale model railway...  tomorrow :)
Cheers
Rod

2013/07/14

2013 July 14

2013 July 14  Sunday






well eh?  um?  The old man model railway "trolley" is in use and does it help!!   Wiring in the new track :)  I could do this all day long, I only have to wonder why I don't? :(





Here it is adjusted so that I can lay on my gut and straighten the SG track before fixing it in place.





Spent three days in the shed since returning from Queensland. This shows the three lengths of track installed and wired into the DCC main. What it does not show is the cleanup to enable the trolley to fit underneath. The drilling of 4 new holes to correct the adjustment of the red plastic base to clear the layout at this spot. and a few other things that had to be done before one length of track could be laid.


.
 
The girder bridge is a place mark till I figure out what to use here. I wanted to create a modern (well 60's concrete over bridge similar to Jacana, Still might if I cab figure out how to do it :)

Off to South Australia for the rest of week with Tony K
So not much more is going to happen here, I guess.
Don't ask me about my car :(   Its back at the dealer with leaking diesel smoking up the country side once again! . Thought that this is becoming a nightmare, but at least it did get me home from the Qld trip. Turns out the return line from the injector pump to the tank is made from plastic as well. It is the only part of the fuel system that was not replaced so far. Another charge to add to the Insurance Company bill :(  I am assured that nothing else is left to replace... but they did say that last time, I think.
Cheers
Rod Young

2013/07/08

2013 July 8

2013 July 8  Monday
  Sun is out... no its not... yes it is...... :)
OK the trip behind me and after thinking a lot about the layout whilst away, this is what I did today. Tried to construct this part as open frame. However it became obvious that the temporary escape road was going to prevent that from happening.

This is a rough layout of how I think the track will go.   Obviously in the future the temporary points and track work will come out. I envisage replacing this with a town scene, possibly an Industrial area, so it should work out ok.




The near track is the BG (code 75) and this adjusts slightly to align with the SG (code100) loop. It appears that the temporary BG can cross using a small crossover, and to my eyes at least it looks OK and should not cause a lot of difficulties with signalling. The SG continues via points along the back wall to diverge into the temp escape. In the distance the SG loop starts and the third track is the cripple road as per 1962 VR practice.



BG parallels SG loop no.1 Road then No.2 Loop road and Cripple Road. Further over BG and SG temp escape roads.




The short Crossing works better here than the long one. Had no idea where I was going to use these. I got them in a job lot  ;)



SG diverges left and crosses the BG before dividing into loop. The BG divides further back forming the crossing and the escape. The straight leg continues forward and parallels the SG around into Wodonga Station.



The SG standard loop arrangement.

Happy to return home, I guess but happier that the enthusiasm has remained

Cheers
Rod Young

2013/06/24

2013 June 24

2013 June 24  Monday a cold one

Well what a rotten few weeks I have had :( Added to the last month or more it has been just one disaster after another. Starting with my lovely Rover. I had to ride through flood water heading for Esperence in December 2011.  The air bag suspension started to fail because the pump was unable to keep the supply up.  RACV or equivalent in WA got me going and told me to buy a new compressor. This one was water damaged. It seems that local Ford Dealer is also the Land Rover dealer and when it was recalled several years earlier they had replaced the compressor with another Ford built one which very quickly failed and was replaced again. I wish they had left the genuine Land Rover in place. The compressor would have still be sealed and I guarantee it woud be still working. So I ordered a new pump, from Kiama 4x4 and when I arrived in Adelaide took car in to have pump replaced. According to dealer their was nothing wrong with it and he merely sealed up the compressor and it ran ok till last week when it failed on the way to Bendigo. Add that to the contaminated fuel in the last 12 months and I have been experiencing a disaster.
My poor old car is now fixed.  The Rover failed because of rotten service and because a gutless United Fuel Manager sold bio diesel and I have been told my mix was 50% or more. Considering the tank had 30 litres in it when I refilled that equates to pure bio diesel.   Nothing wrong with the vehicle, its just the lousy morals of the people you have to deal with today  :(
Ok in a few hours I am starting my trip to the Gold Coast to see my Mum and Dad on their 90th Bday (Celebrating both on Friday)

Just an update!


The new base is now finished linking the helix with the temporary track to the Coal Siding.
The permanent connection to Wodonga will be constructed after the temporary track is laid and tested ok.
 Now I can make it  ready for track. First the SG crosses the Wanganella station yards and heads North, slowly dropping 8cm to the BG level which rises 4cm to reduce the grade.



The BG track and the SG track arrive at the same level and proceed around to Wodonga Station. Here I am laying out the temporary diverge just prior to the new SG loop A BG and SG track will continue to lower until it can pass under the Wanganella to Wodonga track and enter the Coal siding thus creating a return loop (temporary)



typically I found that I had not allowed sufficient room for the SG loop. I need to provide more roadbed in order to lay the loop. The BG closest to the front edge needs to move over 2 inches to create room for a third track (bugger)
Here the temporary bg track crosses over the SG before the loop points
And the SG will get a temporary point on the lower edge of this picture branching to the right and heading towards the lower level and the coal siding.
And so now, its all waiting for my return :)

New Additions









New shed waiting for weathering. Was going to leave that name but it will become Wodonga Motor recyclers.


Start of Wanganella Shopping Centre.


Another shed

I also picked up a nice ZP and TP but I blurred the picture

Cheers
Rod

2013/06/16

2013 June 16

2013 June 16 sunny Sunday



Opened the door and walked to this wall. On Friday and Saturday I sorted out where the track was going, trimmed the ply and cut the supports. Not only did I have to keep the boards close to the string line, I needed to use the small level to maintain side to side level, and I could have put some camber on the curves, however I decided not to. And then today I was able to tie it all down. Let the pictures tell the story!



Actually the pictures is telling lies :)  As the back track drops at 1.5% the near track is rising at 1.5%  The 3% difference is what the picture shows ;)




At this end I finished up removing all existing track and ply base. I also decided to remove all the risers which were only nailed in position. I had put a temporary yard in, to hold trains in the  early days. I did not remember iot was not screwed and glued.  All good now!




Adjusting the risers and correcting the line.




All fixed and in great condition. I actually allowed the track to move into the space between the pillars. Wou;d have liked to have taken it in further, however my minimum 36" curves would not allow it, and still leave enough room for the Wangaratta platform.




Same place just adjusted the view




Ok here the SG arrives at the same level as the BG (See the gradient looks a lot better in this shot)
The wider baseboard is needed because the SG Loop starts here and as well the temporary escape will start to drop towards the back and the loop will maintain this height and run down the front of the board before crossing over the temp escape and entering Wodonga Station






The escape fixed into position.












Well at this stage I ran out of steam. I can lay track down here when I return from my trip to Queensland.  Not sure how long I am going for at this stage. Depends on how well my repaired Rover runs, how much fuel I need and the weather, I guess. Would like to get to Townsville, but that is going to be expensive and I have Austrains G Class, Auscisions Walkers and the GM's to pay for as well as the Caulfield Exhibition :)

Anyway might get a few more days in, after returning from Bendigo on Wednesday.
Cheers
Rod

2013/06/10

2013 June 10

 2013 June 10  Monday





Designing how to get the SG out of the Helix and behind Wanganella.  Hours of measuring and re measuring but finally got it sorted.  Installed a temporary bridge. If I use this bridge it will require modifying. I will have to stagger the sides to cross the lower track at an angle. Should not be too hard a job. But put it in to allow a test train when I get the loop connected in.





So far so good. A string line shows that the 20 cm drop required is not going to be a huge gradient, maybe 2% ?




Its unfortunate that the SG is high above Wanganella, when I intended it to be in a cutting like Wangaratta, but it cant be helped now. Whilst pondering a fix, I thought I should have allowed the SG to exit the bottom of the helix with the BG exiting at the present SG height. However to do that now would be a disaster waiting to happen, so I will just live with it.









Just gently curving it in behind the station whilst lowering it back down to the BG level. See string line!






Raising the BG a few cm out of Wanganella, allows the SG to level with it near the start of the SG loop, points in position.



The board that carries the diverge is roughly in position. (The temporary feed into Coal Siding Northern end.
The Sg Loop will be built in front of the diverge and proceed around with a very gentle climb, to enter Wodonga Station from the South.





Checking the levels with a cheap laser level (the laser light is the top line, the lower being the string line.


Well I guess a little work got done. Most of the cutting out is finished too, ready for installation tomorrow ?
Cheers
Rod

2013/06/08

2013 June 8

2013 June 8  Saturday Cold!!



Well tradition has it that something installed must be replaced whenever possible. I must be a visual person :( Requiring an eyefull before I can see it won't work ;)
So I modified the Albury end of the Coal Siding taking into consideration the permanent track bed which I will need in the future. Then reattached the diversion and test fitted track to see how it looks/ Pleased with this (Click on picture for larger view) I also adjusted the other track base leading in from the Wodonga Station.  Final positions all marked. Now to place in position all the cross pieces and support everything, before fixing track in position.
It has been decided to insulate the two temporary tracks at the closest gauge block and create two reversing tracks about 7 m long to fix the reversing loop problem created by this diversion. I will use one of the Hex juicers here. Part 1 and 2 for the BG  AR   Part 3 and 4 for the SG   AR, and 5 and 6 can change polarity for the points at the throat of the reverse loop (one SG and one BG point)
Cheers
Rod

2013/06/07

2013 June 7

2013 June 7 Friday




This picture shows the extension and the joining into the temporary loop back into the system



This picture shows the permanent connection towards Albury


Here we can see the temporary section passing under the Wangaratta to Wodonga main line. Scenery will hide the temporary diversion and you will only see the Wodonga main line on top.


I split the large curves in half to allow for both ends of the curve. Unfortunately the saw cut reduced an already tight track bed and I will have to let the foam underlay hang over the side. My best option is to use scrap thin ply to run along the edge to support the scenery. Not so bad.




Shows the diversion track on the bag wall towards Wanganella in position but as yet not set to the correct gradient.


About where the glue bottle is, will be the top of the small hill out of Wang. This hill was placed to pick up the SG which runs behind Wang 10.5 cm higher than the BG (as different to reality where the SG runs in a cutting. This again was another compromise and was used to position the SG after a reverse loop.




The permanent tracks will run in front, after I align the temporary ones into correct location. I will just create a box with cross pieces to enable the trackbed to be supported. This will hide the diverted track which will be hidden by a cutting and hill.



Just placing the Albury curve into position to work out where the backboard will extend to.  In fact I will install this now and it will allow me to create scenery in the future that will not have to be removed for the extension.




Side shot showing 10 and 10.5 cm clearances...   All good

Now all I need do is cut and install the cross pieces then carefully using a string line and a gradient level, fix the track into its final position. Apply strengthening, then lay the track :)

Cheers
Rod

2013/06/05

2013 June 5

2013 June 5
Cold!! 4 C to 14C and a South wind off the snowfields it would seem

Not a lot happened. Got to cut out the curves and glue boards together and set up the Curves at the end of the room connecting the coal sidings into the main layout along the long wall. This is a temporary connection to Wanganella, which will eventually be removed when the layout along the west wall of the studio is completed in the future. Next job here will be to set the steady 1% gradient in place then strengthen the curved ply much the same as I did on the 270 deg. Curve between Coal "hole" and Wodonga.  Just noticed that separation between the temporary track and the permanent connection into Wodonga (uncle Bens end) may be under 10.5cm the minimum set for double stack (should anybody visit with a set)
The curves are 42'' and look nice!
Cheers
Rod

2013/06/04

2013 June 4

2013 June 4

Distracted again today :(
Went to Yackandandah Engineering to buy some angle iron, but as usual no one was there to serve me. Ended up going into Wodonga where I got exactly what I wanted, cut to size as well.
Friend Jim offered to bring his welder and fix up the angle bracket supports which I used to stabilise the top level in the middle of room.  I have decided I cannot live with the angled supports to these brackets that are in full view. As the whole branch line is well supported by the shelving central posts, these angle brackets only stabilise, and I decided that if I reinforce the top plate with 40 x 40 mm angle iron it will be able to do this without the angle bracket support. Jim came over and took half the brackets home to weld them up for me. When they come back we will install them and then do the other side. Anyway today was otherwise not very productive as was this evening sleeping in front of the tv. :D
Tuesday is often shopping day, so maybe so will tomorrow.
Cheers
Rod