2020/02/03

2020_02_02 Procrastination!!

2020_02_02 I need to wire the old helix :(

Instead I find lots  to do, but the layout is finally back together and working better than it ever has, except for the helix which was stripped and never rewired.

In the last week....

Al finished the track work at old Bullarto








And I rewired it and fitted the point motors.

ALLANDALE






OOPS!!  I had not noticed that the backdrop had fallen in. Better fix that today :(




Al refurbished his namesake station that was suffering. He did such a good job, I think I might have to move the track and turn the building to face the aisle :)

AND I PROCRASTINATED!!






I guess I cleared the table. Its a big table and it accumulates a lot of stuff. It gets in the way and has never worked out for me.

But what am I going to do with all those unfinished jobs sitting on the layout?






 They certainly will not fit here, which was found under years of collected rubbish which was sorted and mostly thrown out.


So this is my work station.  To use it, I am just going to haveto learn to store stuff between jobs.
I think I will move the storage boxes on the left and build some shelves to hold all the unfinished stuff to keep it off this very small work place, to enable me to get some projects finished.

Cheers
Rod

No comments:

Post a Comment

All comments and suggestions from like minded individuals always welcomed. Help make this railway better :D